| Bellefield Solar and Energy Storage Farm | Kern | 1,000 MW | 2 | 2025 |
| Topaz Solar Farm | San Luis Obispo | 586 MW | 5 | 2013 |
| Rexford Solar Farm | Tulare | 540 MW | 2 | 2025 |
| Solar Blue | Kings | 475 MW | 2 | 2023 |
| Eland Solar & Storage Center, Phase 1 Hy | Kern | 460 MW | 2 | 2024 |
| Eland Solar & Storage Center, Phase 2 Hy | Kern | 458 MW | 2 | 2025 |
| Desert Quartzite | Riverside | 450 MW | 2 | 2024 |
| Daggett 3 | San Bernardino | 449 MW | 2 | 2023 |
| Slate Hybrid | Kings | 440 MW | 9 | 2021 |
| Arica Solar | Riverside | 399 MW | 2 | 2024 |
| Oberon II Solar Project | Riverside | 375 MW | 2 | 2023 |
| Oberon Solar Project | Riverside | 375 MW | 2 | 2023 |
| Arlington Energy Center II | Riverside | 365 MW | 3 | 2022 |
| Proxima | Stanislaus | 352 MW | 2 | 2024 |
| Scarlet II Hybrid | Fresno | 350 MW | 2 | 2024 |
| Golden Field Solar III, LLC | Kern | 339 MW | 2 | 2020 |
| Blythe Mesa Solar II | Riverside | 336 MW | 2 | 2022 |
| Solar Star 1 | Kern | 318 MW | 7 | 2014 |
| Desert Sunlight 300, LLC | Riverside | 314 MW | 11 | 2013 |
| Daggett 2 | San Bernardino | 313 MW | 2 | 2023 |
| Stateline Solar | San Bernardino | 300 MW | 7 | 2015 |
| Edwards Sanborn E1A | Kern | 293 MW | 2 | 2022 |
| Edwards Sanborn E1B | Kern | 290 MW | 2 | 2022 |
| Fifth Standard Solar PV, LLC (Hybrid) | Fresno | 287 MW | 2 | 2023 |
| Chestnut | Kings | 286 MW | 2 | 2023 |
| Mojave Solar Project | San Bernardino | 280 MW | 2 | 2014 |
| Solar Star 2 | Kern | 279 MW | 6 | 2014 |
| RE Tranquillity | Fresno | 277 MW | 3 | 2016 |
| RE Garland | Kern | 273 MW | 3 | 2016 |
| Chaparral Springs | Kern | 262 MW | 4 | 2025 |
| Edwards Sanborn E2 | Kern | 258 MW | 2 | 2021 |
| Rosamond South 1 | Kern | 257 MW | 2 | 2025 |
| AV Solar Ranch One | Los Angeles | 253 MW | 1 | 2014 |
| Mount Signal Solar Farm V | Imperial | 252 MW | 1 | 2018 |
| Blythe Solar III, LLC Hybrid | Riverside | 252 MW | 2 | 2020 |
| Aquamarine | Kings | 250 MW | 1 | 2021 |
| Athos Solar Project | Riverside | 250 MW | 1 | 2022 |
| Genesis Solar Energy Project | Riverside | 250 MW | 2 | 2013 |
| Victory Pass | Riverside | 250 MW | 2 | 2024 |
| California Valley Solar Ranch | San Luis Obispo | 250 MW | 5 | 2012 |
| Desert Sunlight 250, LLC | Riverside | 250 MW | 9 | 2013 |
| Edwards Sanborn E4 | Kern | 249 MW | 2 | 2022 |
| Northern Orchard Solar PV, LLC | Kern | 242 MW | 2 | 2025 |
| Arlington Energy Center III | Riverside | 241 MW | 2 | 2022 |
| Scarlet Solar (CA) | Fresno | 240 MW | 2 | 2024 |
| Baldy Mesa Solar & Storage | San Bernardino | 225 MW | 2 | 2024 |
| Raceway Solar & Storage | Los Angeles | 205 MW | 2 | 2024 |
| Great Valley Solar Portfolio Holdings, L | Fresno | 203 MW | 4 | 2017 |
| Luna Valley | Fresno | 200 MW | 1 | 2025 |
| SE Athos II, LLC | Riverside | 200 MW | 1 | 2021 |
| Sandrini Solar 200 | Kern | 200 MW | 1 | 2024 |
| Wright Solar Park | Merced | 200 MW | 1 | 2019 |
| Imperial Valley Solar, LLC | Imperial | 200 MW | 3 | 2013 |
| Sandrini Solar 100 | Kern | 195 MW | 2 | 2024 |
| Blythe Solar IV, LLC | Riverside | 184 MW | 3 | 2020 |
| RE Mustang LLC | Kings | 175 MW | 2 | 2016 |
| Centinela Solar Energy | Imperial | 175 MW | 6 | 2013 |
| Lockhart Solar PV, LLC | San Bernardino | 169 MW | 2 | 2023 |
| BigBeau Solar, LLC | Kern | 168 MW | 4 | 2022 |
| Resurgence Solar | San Bernardino | 165 MW | 2 | 2023 |
| Solar Gen 2 Solar Facility | Imperial | 163 MW | 3 | 2014 |
| Rancho Seco Solar II, LLC | Sacramento | 160 MW | 1 | 2021 |
| Springbok Solar Farm 2 | Kern | 155 MW | 1 | 2016 |
| Mount Signal Solar Farm II | Imperial | 154 MW | 1 | 2020 |
| North Rosamond Solar LLC | Kern | 151 MW | 1 | 2019 |
| CA Flats Solar 150, LLC | San Luis Obispo | 150 MW | 1 | 2019 |
| Hudson - High Desert Hybrid | San Bernardino | 150 MW | 2 | 2021 |
| Maverick Solar 6, LLC | Riverside | 150 MW | 2 | 2021 |
| Mustang Two | Kings | 150 MW | 2 | 2020 |
| Imperial Solar Energy Center West | Imperial | 149 MW | 1 | 2016 |
| Edwards Sanborn 1C | Kern | 148 MW | 2 | 2025 |
| Campo Verde Solar | Imperial | 147 MW | 1 | 2013 |
| Lockhart Solar PV II | San Bernardino | 144 MW | 2 | 2023 |
| Panoche Valley Solar Farm | San Benito | 140 MW | 1 | 2018 |
| Ivanpah 2 | San Bernardino | 133 MW | 1 | 2013 |
| Ivanpah 3 | San Bernardino | 133 MW | 1 | 2013 |
| Maverick Solar 7, LLC | Riverside | 132 MW | 1 | 2021 |
| CA Flats Solar 130, LLC | San Luis Obispo | 130 MW | 1 | 2017 |
| Imperial Solar Energy Center South | Imperial | 129 MW | 1 | 2013 |
| American Kings Solar, LLC | Kings | 128 MW | 1 | 2020 |
| Ivanpah 1 | San Bernardino | 126 MW | 1 | 2013 |
| Desert Breeze Solar, LLC | San Bernardino | 125 MW | 1 | 2026 |
| Maverick Solar, LLC | Riverside | 125 MW | 1 | 2020 |
| Rabbitbrush Solar, LLC | Kern | 120 MW | 2 | 2022 |
| Edwards Sanborn E5 | Kern | 115 MW | 2 | 2022 |
| Valentine Solar, LLC | Kern | 111 MW | 1 | 2019 |
| Catalina Solar LLC | Kern | 110 MW | 1 | 2012 |
| Quinto Solar PV Project | Merced | 108 MW | 1 | 2015 |
| Willow Spring Solar, LLC | Kern | 108 MW | 1 | 2019 |
| Wistaria Ranch Solar | Imperial | 107 MW | 1 | 2018 |
| Antelope Expansion 2 | Los Angeles | 105 MW | 1 | 2018 |
| Desert Harvest II LLC | Riverside | 105 MW | 2 | 2020 |
| Springbok Solar Farm 1 | Kern | 105 MW | 1 | 2016 |
| Henrietta Solar Project | Kings | 102 MW | 1 | 2016 |
| Drew Solar LLC | Imperial | 100 MW | 1 | 2022 |
| Maverick Solar 4, LLC | Riverside | 100 MW | 1 | 2020 |
| RE Astoria | Kern | 100 MW | 1 | 2016 |
| San Pablo Raceway | Los Angeles | 100 MW | 1 | 2019 |
| SF Azalea, LLC | Kern | 98 MW | 2 | 2025 |
| Springbok 3 Solar Farm Hybrid | Kern | 92 MW | 2 | 2019 |
| Resurgence Solar II | San Bernardino | 88 MW | 2 | 2023 |
| Solverde 1 | Los Angeles | 85 MW | 1 | 2016 |
| Edwards Sanborn S1 | Kern | 85 MW | 2 | 2022 |
| Estrella Solar & Storage | Los Angeles | 84 MW | 2 | 2023 |
| Desert Harvest, LLC | Riverside | 80 MW | 1 | 2020 |
| Arrowleaf Solar and Storage | Imperial | 77 MW | 2 | 2025 |
| Baldy Mesa 2_Silver Peak Hybrid | San Bernardino | 75 MW | 2 | 2024 |
| RE Astoria 2 | Kern | 75 MW | 1 | 2016 |
| Colgreen North Shore Solar Farm | Riverside | 75 MW | 1 | 2018 |
| Edwards Sanborn S3 | Kern | 71 MW | 2 | 2022 |
| Titan Solar 1 (CA) | Imperial | 70 MW | 1 | 2020 |
| Alpine Solar | Los Angeles | 66 MW | 1 | 2013 |
| RE Gaskell West 2 LLC | Kern | 65 MW | 2 | 2023 |
| North Star Solar | Fresno | 62 MW | 1 | 2015 |
| Edwards Sanborn S4 | Kern | 60 MW | 2 | 2022 |
| Five Points Solar Park | Fresno | 60 MW | 1 | 2016 |
| RE Barren Ridge 1 | Kern | 60 MW | 1 | 2016 |
| Regulus Solar Project | Kern | 60 MW | 1 | 2014 |
| Hecate Energy Beacon Solar 1 | Kern | 56 MW | 1 | 2017 |
| Hecate Energy Beacon Solar 3 | Kern | 56 MW | 1 | 2016 |
| Luciana | Tulare | 56 MW | 1 | 2022 |
| Golden Fields Solar I, LLC | Kern | 54 MW | 1 | 2016 |
| Solar Star California, XLI, LLC | Kern | 54 MW | 1 | 2016 |
| Alpaugh 50 | Tulare | 50 MW | 1 | 2012 |
| Antelope DSR 1 | Los Angeles | 50 MW | 1 | 2016 |
| Borden Solar Farm | Madera | 50 MW | 1 | 2020 |
| Hecate Energy Beacon Solar 4 | Kern | 50 MW | 1 | 2016 |
| Little Bear 4 | Fresno | 50 MW | 1 | 2020 |
| Little Bear 5 | Fresno | 50 MW | 1 | 2020 |
| Midway Solar Farm 1 | Imperial | 50 MW | 1 | 2018 |
| Ocotillo Wells | San Diego | 50 MW | 1 | 2023 |
| SloughHouse Solar, LLC | Sacramento | 50 MW | 1 | 2025 |
| Beacon Solar Plant Site 2 | Kern | 47 MW | 1 | 2017 |
| RE Camelot LLC | Kern | 45 MW | 1 | 2014 |
| Camino Solar Hybrid | Kern | 44 MW | 1 | 2025 |
| Central 40 | Stanislaus | 40 MW | 1 | 2021 |
| Cuyama Solar, LLC | Santa Barbara | 40 MW | 1 | 2017 |
| Elevation Solar C | Los Angeles | 40 MW | 1 | 2016 |
| Little Bear Solar 1, LLC | Fresno | 40 MW | 1 | 2020 |
| Edwards Sanborn E3 | Kern | 38 MW | 2 | 2021 |
| Beacon Solar Plant Site 5 | Kern | 38 MW | 1 | 2017 |
| Paulsell | Stanislaus | 35 MW | 2 | 2024 |
| Lost Hills/Blackwell | Kern | 32 MW | 2 | 2015 |
| P66 Rodeo Solar | Contra Costa | 30 MW | 1 | 2023 |
| Chevron - Lost Hills Hybrid | Kern | 30 MW | 1 | 2020 |
| Citizens Imperial Solar | Imperial | 30 MW | 1 | 2019 |
| Midway Solar Farm II | Imperial | 30 MW | 1 | 2017 |
| Seville 2 | Imperial | 30 MW | 1 | 2015 |
| Hayworth Solar | Kern | 27 MW | 1 | 2015 |
| Solar Borrego I | San Diego | 26 MW | 1 | 2013 |
| Vandenberg Solar Project | Santa Barbara | 25 MW | 1 | 2017 |
| Axium Modesto Solar | Stanislaus | 25 MW | 1 | 2012 |
| Imperial Valley Solar Company 1 LLC | Imperial | 23 MW | 1 | 2012 |
| San Joaquin Solar | Fresno | 21 MW | 2 | 2018 |
| Solar Blythe LLC | Riverside | 21 MW | 1 | 2009 |
| Lockheed Martin Palmdale Solar PV | Los Angeles | 21 MW | 2 | 2016 |
| Atwell Island | Tulare | 20 MW | 1 | 2013 |
| RE Garland A | Kern | 20 MW | 1 | 2016 |
| AP North Lake I, LP | Riverside | 20 MW | 1 | 2015 |
| Adelanto Solar, LLC | San Bernardino | 20 MW | 1 | 2015 |
| Adera Solar | Madera | 20 MW | 1 | 2015 |
| Adobe Solar | KERN | 20 MW | 1 | 2014 |
| Alamo Solar | San Bernardino | 20 MW | 1 | 2015 |
| Algonquin SKIC20 Solar LLC | Kern | 20 MW | 1 | 2015 |
| Alpaugh North | Tulare | 20 MW | 1 | 2012 |
| Antelope Big Sky Ranch | Los Angeles | 20 MW | 1 | 2016 |
| Antelope DSR 3 | Los Angeles | 20 MW | 1 | 2019 |
| Atwell Island West Solar | Tulare | 20 MW | 1 | 2015 |
| BCE Los Alamitos 1 | Orange | 20 MW | 2 | 2023 |
| BCE Los Alamitos 2 | Orange | 20 MW | 2 | 2023 |
| Bayshore Solar A, LLC | Los Angeles | 20 MW | 1 | 2017 |
| Bayshore Solar B, LLC | Los Angeles | 20 MW | 1 | 2017 |
| Bayshore Solar C, LLC | Los Angeles | 20 MW | 1 | 2017 |
| Blackwell Solar Park | Kern | 20 MW | 1 | 2019 |
| CED Ducor 1 | Tulare | 20 MW | 1 | 2016 |
| CED Ducor 2 | Tulare | 20 MW | 1 | 2016 |
| CED Ducor 4 | Tulare | 20 MW | 1 | 2016 |
| CID Solar, LLC | Kings | 20 MW | 1 | 2014 |
| Calipatria Solar Farm | Imperial | 20 MW | 1 | 2016 |
| Cantua Solar Station | Fresno | 20 MW | 1 | 2012 |
| Central Antelope Dry Ranch C | Los Angeles | 20 MW | 1 | 2016 |
| Corcoran Solar | Kings | 20 MW | 1 | 2013 |
| Corcoran Solar 3 | Kings | 20 MW | 1 | 2016 |
| Coronal Lost Hills | Kern | 20 MW | 1 | 2015 |
| Frontier Solar LLC | Stanislaus | 20 MW | 1 | 2016 |
| Gaskell West 1 Solar Facility | Kern | 20 MW | 1 | 2018 |
| Gates Solar Station | Fresno | 20 MW | 1 | 2013 |
| Giffen Solar Park | Fresno | 20 MW | 1 | 2017 |
| Guernsey Solar Station | Kings | 20 MW | 1 | 2013 |
| Huron Solar Station | Fresno | 20 MW | 1 | 2012 |
| Imperial Valley Solar Co (IVSC) 2, LLC | Imperial | 20 MW | 1 | 2015 |
| Jacumba Solar Farm | San Diego | 20 MW | 1 | 2017 |
| Kettleman Solar -Centaurus | Kings | 20 MW | 1 | 2015 |
| Kingbird A Solar LLC | Kern | 20 MW | 1 | 2016 |
| Kingbird B Solar, LLC | Kern | 20 MW | 1 | 2016 |
| Little Bear 3 | Fresno | 20 MW | 1 | 2020 |
| Lone Valley Solar Park II LLC | San Bernardino | 20 MW | 1 | 2014 |
| Longboat Solar, LLC | San Bernardino | 20 MW | 1 | 2016 |
| Maricopa West Solar PV, LLC | Kern | 20 MW | 1 | 2015 |
| Midway Solar Farm III | Imperial | 20 MW | 1 | 2018 |
| NextEra Westside PV | Fresno | 20 MW | 1 | 2017 |
| Nicolis Solar PV Plant | Tulare | 20 MW | 1 | 2016 |
| North Lancaster Ranch | Los Angeles | 20 MW | 1 | 2016 |
| Oro Loma | Fresno | 20 MW | 1 | 2017 |
| Portal Ridge Solar B, LLC | Los Angeles | 20 MW | 1 | 2017 |
| Pumpjack Solar I | Kern | 20 MW | 1 | 2015 |
| RE Gaskell West 3 LLC | Kern | 20 MW | 1 | 2023 |
| RE Gaskell West 4 LLC | Kern | 20 MW | 1 | 2023 |
| RE Gaskell West 5 LLC | Kern | 20 MW | 1 | 2023 |
| RE Kansas Solar, LLC | Kings | 20 MW | 1 | 2014 |
| RE Kansas South LLC | Kings | 20 MW | 1 | 2013 |
| RE Kent South, LLC | Kings | 20 MW | 1 | 2014 |
| RE Old River One, LLC | Kern | 20 MW | 1 | 2014 |
| RE Rosamond One LLC | Kern | 20 MW | 1 | 2014 |
| RE Rosamond Two LLC | Kern | 20 MW | 1 | 2014 |
| RE Victor Phelan Solar One LLC | San Bernardino | 20 MW | 1 | 2013 |
| Redwood 4 Solar Farm | Kern | 20 MW | 1 | 2017 |
| Rio Bravo Solar 1 LLC | Kern | 20 MW | 1 | 2016 |
| Rio Bravo Solar II LLC | Kern | 20 MW | 1 | 2016 |
| SEPV Mojave West | Kern | 20 MW | 1 | 2016 |
| Seville 1 | Imperial | 20 MW | 1 | 2015 |
| Shafter Solar LLC | Kern | 20 MW | 1 | 2015 |
| Sierra Solar Greenworks | Los Angeles | 20 MW | 1 | 2015 |
| Sol Orchard El Centro PV | Imperial | 20 MW | 1 | 2013 |
| Solar Blythe 2 | Riverside | 20 MW | 1 | 2017 |
| Solar Oasis LLC | Los Angeles | 20 MW | 1 | 2016 |
| Stroud Solar Station | Fresno | 20 MW | 1 | 2011 |
| Summer Solar LLC | Los Angeles | 20 MW | 1 | 2016 |
| Sun City Project LLC | Kings | 20 MW | 1 | 2011 |
| Sunray 2 | San Bernardino | 20 MW | 1 | 2017 |
| TA-Acacia, LLC | Los Angeles | 20 MW | 1 | 2014 |
| TA-High Desert LLC | Los Angeles | 20 MW | 1 | 2013 |
| Vega Solar | Merced | 20 MW | 1 | 2015 |
| Western Antelope Blue Sky B | Los Angeles | 20 MW | 1 | 2016 |
| Western Antelope Blue Sky Ranch A | Los Angeles | 20 MW | 1 | 2014 |
| White River Solar | Tulare | 20 MW | 1 | 2013 |
| Whitney Point Solar | Fresno | 20 MW | 1 | 2017 |
| Windhub Solar A LLC | Kern | 20 MW | 1 | 2019 |
| Wister Solar | Imperial | 20 MW | 1 | 2022 |
| Almond | Kings | 20 MW | 1 | 2023 |
| RB Inyokern Solar WDAT 1203 (CSG) | Kern | 20 MW | 1 | 2024 |
| Corcoran Solar 2 | Kings | 20 MW | 1 | 2015 |
| White River Solar 2 | Tulare | 20 MW | 1 | 2014 |
| Wildwood Solar I, LLC | Kern | 20 MW | 1 | 2015 |
| Columbia Solar Energy, LLC | Contra Costa | 19 MW | 1 | 2015 |
| RE Adams East, LLC | Fresno | 19 MW | 1 | 2014 |
| Sand Drag LLC | Kings | 19 MW | 1 | 2011 |
| Cascade Solar | San Bernardino | 19 MW | 1 | 2014 |
| Catalina Solar 2, LLC | Kern | 18 MW | 1 | 2015 |
| Westlands Solar PV Farm | Fresno | 18 MW | 1 | 2014 |
| Wonderful Lost Hills | Kern | 17 MW | 1 | 2021 |
| Antelope Expansion 1B | Los Angeles | 17 MW | 1 | 2022 |
| SMUD at Grundman | Sacramento | 17 MW | 1 | 2011 |
| Redcrest Solar Farm | Kern | 17 MW | 1 | 2015 |
| Fresno-Clovis RWRF | Fresno | 17 MW | 2 | 2025 |
| CED Avenal | Kings | 16 MW | 1 | 2017 |
| Antelope Expansion 3A | Los Angeles | 15 MW | 1 | 2021 |
| CED Ducor 3 | Tulare | 15 MW | 1 | 2016 |
| Five Points Solar Station | Fresno | 15 MW | 1 | 2011 |
| Morelos del Sol | Kern | 15 MW | 1 | 2015 |
| RE Columbia Two, LLC | Kern | 15 MW | 1 | 2014 |
| Westside Solar Station | Fresno | 15 MW | 1 | 2011 |
| Wildwood Solar II | Kern | 15 MW | 1 | 2017 |
| Woodmere Solar Farm | Kern | 15 MW | 1 | 2015 |
| Apple Campus 2 PV | Santa Clara | 14 MW | 1 | 2017 |
| Tropico Solar PV Plant | Tulare | 14 MW | 1 | 2016 |
| Sunray 3 | San Bernardino | 14 MW | 1 | 2017 |
| Java Solar, LLC | Kings | 14 MW | 1 | 2022 |
| UC Davis South Campus | Yolo | 13 MW | 1 | 2015 |
| Wildflower Solar 1 | Sacramento | 13 MW | 1 | 2020 |
| Ardagh Solar | Madera | 13 MW | 1 | 2026 |
| Cottonwood Solar, LLC (City of Corcoran) | Kings | 12 MW | 1 | 2015 |
| Cottonwood Solar, LLC (Goose Lake) | Kern | 12 MW | 1 | 2015 |
| Orion Solar I | Kern | 12 MW | 1 | 2014 |
| SEPV 8 | San Bernardino | 12 MW | 1 | 2013 |
| RB Inyokern Solar WDAT 1281 (CSG) | Kern | 12 MW | 1 | 2024 |
| Portal Ridge Solar C, LLC | Los Angeles | 11 MW | 1 | 2017 |
| Naval Air Weapons Station China Lake | Kern | 11 MW | 1 | 2012 |
| Heber Solar | Imperial | 11 MW | 1 | 2014 |
| Rancho Seco Solar, LLC | Sacramento | 11 MW | 1 | 2016 |
| Marin Clean Energy Solar One | Contra Costa | 11 MW | 1 | 2017 |
| Algonquin SKIC 10 Solar, LLC | Kern | 10 MW | 1 | 2017 |
| Fresno Community Solar | Fresno | 10 MW | 1 | 2024 |
| Giffen | Fresno | 10 MW | 1 | 2012 |
| KDC Solar Madera LLC | Madera | 10 MW | 1 | 2023 |
| Lone Valley Solar Park I LLC | San Bernardino | 10 MW | 1 | 2014 |
| RE Columbia 3 LLC | Kern | 10 MW | 1 | 2014 |
| SEPV Palmdale East | Los Angeles | 10 MW | 1 | 2015 |
| West Gates Solar Station | Fresno | 10 MW | 1 | 2013 |
| Western Antelope Dry Ranch | Los Angeles | 10 MW | 1 | 2016 |
| Solar Star California, XLIV, LLC | Los Angeles | 9.5 MW | 1 | 2016 |
| Aspiration G | Fresno | 9.0 MW | 1 | 2017 |
| SEPV9 Power Plant | San Bernardino | 9.0 MW | 1 | 2013 |
| Pine Tree Solar Project | Kern | 8.5 MW | 1 | 2013 |
| Sierra Pacific Industries (2042-RD) | Tehama | 8.4 MW | 1 | 2020 |
| Orion Solar II | Kern | 8.0 MW | 1 | 2014 |
| Lemoore West | Kings | 7.9 MW | 1 | 2022 |
| Avenue 26 Solar | Madera | 7.6 MW | 2 | 2024 |
| HL Solar (Lassen) | Lassen | 7.6 MW | 1 | 2019 |
| USPS PV | Los Angeles | 7.4 MW | 1 | 2017 |
| Tequesquite Landfill Solar PV Project | Riverside | 7.3 MW | 1 | 2015 |
| Adelanto Solar II, LLC | San Bernardino | 7.0 MW | 1 | 2015 |
| Amazon SAN3 Solar Project | San Diego | 7.0 MW | 2 | 2024 |
| SCDA Solar 1 | Sacramento | 7.0 MW | 1 | 2017 |
| Adelanto Solar Project | San Bernardino | 6.8 MW | 1 | 2012 |
| Genentech-Oceanside Hybrid | San Diego | 6.5 MW | 2 | 2016 |
| Summer North Solar | Los Angeles | 6.5 MW | 4 | 2014 |
| Berrenda Mesa Water District | Kern | 6.4 MW | 1 | 2023 |
| Desert Green Solar Farm LLC | San Diego | 6.3 MW | 1 | 2014 |
| SFDK Solar | Solano | 6.3 MW | 1 | 2019 |
| Genentech Vacaville Meter #1 | Solano | 6.1 MW | 2 | 2017 |
| Avenal Park | Kings | 6.0 MW | 1 | 2011 |
| Calipatria State Prison | Imperial | 6.0 MW | 1 | 2019 |
| Centinela State Prison | Imperial | 6.0 MW | 1 | 2019 |
| Amazon Bakersfield 1 Solar Project | Kern | 5.9 MW | 2 | 2024 |
| Community Solar 1 | Imperial | 5.7 MW | 1 | 2014 |
| Big Bear | Los Angeles | 5.5 MW | 1 | 2020 |
| University of the Pacific | San Joaquin | 5.5 MW | 2 | 2022 |
| Wonderful Firebaugh | Madera | 5.4 MW | 1 | 2022 |
| Bakersfield PV 1 | Kern | 5.3 MW | 1 | 2017 |
| Foster Clean Power B | Humboldt | 5.2 MW | 2 | 2025 |
| Intel Folsom Phase 3 | Sacramento | 5.2 MW | 1 | 2016 |
| Lerdo Detention Facility - Solar 2, 3 | Kern | 5.2 MW | 2 | 2021 |
| Orange Coast College PH2 Solar Project | Orange | 5.2 MW | 2 | 2022 |
| Tipton 1 - (CA) | Tulare | 5.2 MW | 2 | 2024 |
| Visalia - (CA) | Tulare | 5.2 MW | 2 | 2025 |
| Althea Avenue Solar | Fresno | 5.0 MW | 1 | 2026 |
| Antelope DSR 2 | Los Angeles | 5.0 MW | 1 | 2016 |
| Antelope Expansion 3B | Los Angeles | 5.0 MW | 1 | 2021 |
| Bear Creek Solar (Orinda) | Contra Costa | 5.0 MW | 1 | 2025 |
| Byron Highway Solar | Contra Costa | 5.0 MW | 1 | 2022 |
| CDCR (CA) - Corcoran State Prison | Kings | 5.0 MW | 1 | 2013 |
| CalRenew-1 | Fresno | 5.0 MW | 1 | 2010 |
| Citizen B | Fresno | 5.0 MW | 1 | 2015 |
| Costa View Farms | Madera | 5.0 MW | 1 | 2024 |
| Lake Herman | Solano | 5.0 MW | 1 | 2021 |
| Lancaster Dry Farm Ranch B | Los Angeles | 5.0 MW | 1 | 2014 |
| Lancaster Little Rock | Los Angeles | 5.0 MW | 1 | 2014 |
| North Kern 3 | Kern | 5.0 MW | 1 | 2023 |
| RE Bruceville 1 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE Bruceville 2 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE Bruceville 3 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE Kammerer 1 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE Kammerer 2 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE Kammerer 3 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE McKenzie 1 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE McKenzie 2 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE McKenzie 3 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE McKenzie 4 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE McKenzie 5 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE McKenzie 6 LLC | Sacramento | 5.0 MW | 1 | 2012 |
| RE Rio Grande Solar LLC | Kern | 5.0 MW | 1 | 2013 |
| Ramona 2 | San Diego | 5.0 MW | 1 | 2013 |
| Solar Photovoltaic Project #42 | Tulare | 5.0 MW | 10 | 2012 |
| UC Merced Solar Hybrid | Merced | 5.0 MW | 2 | 2018 |
| Valley Center 2 | San Diego | 5.0 MW | 1 | 2013 |
| Victor Dry Farm Ranch A | San Bernardino | 5.0 MW | 1 | 2015 |
| Victor Dry Farm Ranch B | San Bernardino | 5.0 MW | 1 | 2015 |
| Wheeler Ridge 2 | Kern | 5.0 MW | 1 | 2023 |
| Wonderful Orchards - Belridge | Kern | 5.0 MW | 1 | 2020 |
| Wonderful Orchards - New Columbia | Madera | 5.0 MW | 1 | 2020 |
| Wonderful Orchards - Westside | Kern | 5.0 MW | 1 | 2021 |
| IGS OXR1 | Ventura | 4.8 MW | 1 | 2024 |
| LAX Rental Car Center Solar Power Plant | Los Angeles | 4.8 MW | 1 | 2025 |
| Nachtigall 1836-WD | Kern | 4.6 MW | 1 | 2024 |
| Terry 1818-WD | Kern | 4.6 MW | 1 | 2024 |
| CA Jurupa Valley 3251 De Forest Circle | Riverside | 4.5 MW | 1 | 2024 |
| CSU Long Beach Lots 7 & 14 | Los Angeles | 4.5 MW | 1 | 2017 |
| Farmersville | Tulare | 4.5 MW | 3 | 2014 |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | Los Angeles | 4.5 MW | 1 | 2014 |
| Stenner Creek Solar | San Luis Obispo | 4.5 MW | 1 | 2018 |
| Sunset Reservoir North Basin | San Francisco | 4.5 MW | 1 | 2010 |
| Wheeler Ridge | Kern | 4.5 MW | 1 | 2023 |
| Conflitti Solar | Fresno | 4.4 MW | 1 | 2026 |
| Graniterock Quarry | San Benito | 4.4 MW | 1 | 2022 |
| Redwood Coast Airport Microgrid | Humboldt | 4.4 MW | 2 | 2021 |
| VA Sepulveda Ambulatory Care Center | Los Angeles | 4.4 MW | 1 | 2014 |
| Foster Clean Power A | Humboldt | 4.3 MW | 2 | 2025 |
| IGS KSBD | San Bernardino | 4.3 MW | 1 | 2022 |
| Pacific Ethanol Madera Solar Array | Madera | 4.3 MW | 1 | 2018 |
| Ramona Solar Energy | San Diego | 4.3 MW | 1 | 2017 |
| EMWD - San Jacinto RES BCT | Riverside | 4.2 MW | 1 | 2022 |
| Niagara Bottling - Rialto | San Bernardino | 4.2 MW | 1 | 2021 |
| Canal Energy S23, LLC | Kings | 4.1 MW | 1 | 2021 |
| Five Points Pipeline | Fresno | 4.1 MW | 1 | 2025 |
| Lakeside Pipeline | Kings | 4.1 MW | 1 | 2023 |
| Merced Pipeline | Merced | 4.1 MW | 1 | 2023 |
| RCWD PV Project | Riverside | 4.1 MW | 1 | 2016 |
| Arrache 8083 | Los Angeles | 4.0 MW | 3 | 2013 |
| Blackjack Solar | Monterey | 4.0 MW | 1 | 2020 |
| CA-DGS-California Correctional Inst | Kern | 4.0 MW | 1 | 2024 |
| Chaffey College Rancho Cucamonga Campus | San Bernardino | 4.0 MW | 1 | 2017 |
| Chuckawalla Solar | Riverside | 4.0 MW | 1 | 2012 |
| Double J Dairy Array | Tulare | 4.0 MW | 1 | 2023 |
| Ellis Creek Solar | Sonoma | 4.0 MW | 1 | 2025 |
| Garnet Solar Generation Station I LLC | Riverside | 4.0 MW | 1 | 2014 |
| IOS II-LAX9 | San Bernardino | 4.0 MW | 1 | 2020 |
| Ironwood Solar LLC | Riverside | 4.0 MW | 1 | 2012 |
| Lincoln WWTF Hybrid | Placer | 4.0 MW | 2 | 2021 |
| Lindsay Solar | Tulare | 4.0 MW | 3 | 2014 |
| Munro Valley Solar | Inyo | 4.0 MW | 1 | 2016 |
| North Kern State Prison Phase II | Kern | 4.0 MW | 1 | 2012 |
| North Palm Springs 4A | Riverside | 4.0 MW | 1 | 2012 |
| River Ranch Dairy | Kings | 4.0 MW | 1 | 2024 |
| Rutan | Los Angeles | 4.0 MW | 3 | 2014 |
| UC Riverside Lots 30 & 32 | Riverside | 4.0 MW | 1 | 2017 |
| Amazon PSP1 | Riverside | 3.8 MW | 1 | 2021 |
| Sealed Air Madera Solar Project | Madera | 3.8 MW | 2 | 2022 |
| AVS Lancaster 1 | Los Angeles | 3.7 MW | 1 | 2016 |
| California State Univ at Channel Islands | Ventura | 3.7 MW | 1 | 2021 |
| Kingsburg Solar | Tulare | 3.7 MW | 3 | 2013 |
| Stanford Campus Solar | Santa Clara | 3.7 MW | 1 | 2017 |
| Foothill Sanitary Landfill - Solar Array | San Joaquin | 3.6 MW | 1 | 2021 |
| Sierra Pacific Chinese Camp | Tuolumne | 3.6 MW | 1 | 2022 |
| Visalia Solar | Tulare | 3.6 MW | 2 | 2024 |
| West Valley Mission CCD Solar Project | Santa Clara | 3.6 MW | 2 | 2022 |
| Amazon Visalia (FAT2) | Tulare | 3.5 MW | 1 | 2023 |
| Butte College Main Campus Solar | Butte | 3.5 MW | 1 | 2011 |
| CFF Rice Mill Solar Plant | Colusa | 3.5 MW | 1 | 2025 |
| Crystal Farms Local Solar | Fresno | 3.5 MW | 1 | 2023 |
| Exeter Solar | Tulare | 3.5 MW | 3 | 2014 |
| Ivanhoe Solar | Tulare | 3.5 MW | 3 | 2014 |
| Porterville Solar | Tulare | 3.5 MW | 3 | 2014 |
| Sacramento Regional County Sanitation PV | Sacramento | 3.5 MW | 1 | 2017 |
| Wonderful Kings | Kern | 3.5 MW | 1 | 2022 |
| EMWD - Perris Valley RWRF | Riverside | 3.4 MW | 1 | 2021 |
| CA-DGS RFP-Salinas Valley State Prison | Monterey | 3.3 MW | 1 | 2023 |
| Whitethorn Solar LLC | Alameda | 3.3 MW | 1 | 2016 |
| 8500 Balboa PV, LLC | Los Angeles | 3.2 MW | 2 | 2022 |
| CA OXNARD 2600 Sakioka Dr | Ventura | 3.2 MW | 2 | 2025 |
| Avalon Dairy | Kern | 3.1 MW | 1 | 2024 |
| Corcoran Irrigation District Floating So | Kings | 3.1 MW | 1 | 2025 |
| Malech Solar Farm | Santa Clara | 3.1 MW | 1 | 2017 |
| Aerojet I | Sacramento | 3.0 MW | 1 | 2009 |
| American Canyon Solar | Napa | 3.0 MW | 3 | 2019 |
| Broadway 2 - UC Riverside | Riverside | 3.0 MW | 1 | 2014 |
| CA - Fresno, City of - SE Surface WTP | Fresno | 3.0 MW | 1 | 2025 |
| CA Manteca 730 Spreckels Ave | San Joaquin | 3.0 MW | 2 | 2024 |
| CalCity Solar 1 | Kern | 3.0 MW | 1 | 2019 |
| Central Antelope Dry Ranch B LLC | Los Angeles | 3.0 MW | 1 | 2017 |
| Community Solar Utica 1, LLC | Kings | 3.0 MW | 1 | 2025 |
| Depot Park Solar System | Sacramento | 3.0 MW | 1 | 2010 |
| Dissigno Healdsburg FPV, LLC | Sonoma | 3.0 MW | 1 | 2020 |
| Dos Palos Clean Power | Merced | 3.0 MW | 1 | 2025 |
| Eagle Creek | Kern | 3.0 MW | 1 | 2019 |
| East Cleveland Road Solar | Merced | 3.0 MW | 1 | 2025 |
| Edwards Air Force Base | Kern | 3.0 MW | 3 | 2011 |
| Fresno Solar | Fresno | 3.0 MW | 2 | 2015 |
| Green Acres Solar Facility 1 | Sacramento | 3.0 MW | 1 | 2012 |
| Green Beanworks B PV | Los Angeles | 3.0 MW | 1 | 2018 |
| Green Beanworks C PV | Los Angeles | 3.0 MW | 1 | 2018 |
| Green Beanworks D PV | Los Angeles | 3.0 MW | 1 | 2018 |
| Hanford 1 and 2 | Kings | 3.0 MW | 2 | 2014 |
| IVC Solar | Imperial | 3.0 MW | 1 | 2016 |
| Kern Valley SP | Kern | 3.0 MW | 1 | 2023 |
| Kings CSG 3 LLC Community Solar | Kings | 3.0 MW | 1 | 2025 |
| Lancaster | Los Angeles | 3.0 MW | 1 | 2018 |
| Lancaster WAD B | Los Angeles | 3.0 MW | 1 | 2017 |
| Las Virgenes | Los Angeles | 3.0 MW | 1 | 2020 |
| Little Rock Pham Solar | Los Angeles | 3.0 MW | 1 | 2015 |
| Merced 1 PV | Merced | 3.0 MW | 1 | 2018 |
| Mira Loma | Riverside | 3.0 MW | 3 | 2011 |
| Morongo CRS 1 | Riverside | 3.0 MW | 1 | 2024 |
| NLP Granger | San Diego | 3.0 MW | 1 | 2016 |
| PVN Milliken, LLC | San Bernardino | 3.0 MW | 1 | 2017 |
| Paso Robles - Municipal Airport | San Luis Obispo | 3.0 MW | 1 | 2024 |
| Porterville 6 and 7 | Tulare | 3.0 MW | 2 | 2014 |
| Prologis L.P | San Joaquin | 3.0 MW | 1 | 2018 |
| Putah Creek Solar Farm North | Yolo | 3.0 MW | 1 | 2022 |
| RE Dillard 1 LLC | Sacramento | 3.0 MW | 1 | 2012 |
| RE Dillard 2 LLC | Sacramento | 3.0 MW | 1 | 2012 |
| RE Dillard 3 LLC | Sacramento | 3.0 MW | 1 | 2012 |
| RPUWD Scheuer Well Solar Project | San Bernardino | 3.0 MW | 1 | 2018 |
| SEPV Imperial Dixieland West | Imperial | 3.0 MW | 1 | 2016 |
| Shasta Solar Farm | Shasta | 3.0 MW | 2 | 2014 |
| Sheep Creek Community Solar Farm | San Bernardino | 3.0 MW | 1 | 2023 |
| Silveira Ranch Road Solar | Marin | 3.0 MW | 3 | 2021 |
| Tulare 1 and 2 | Tulare | 3.0 MW | 2 | 2014 |
| Tulare CSG LLC | Tulare | 3.0 MW | 1 | 2024 |
| US-TOPCO (Soccer Center) | Los Angeles | 3.0 MW | 1 | 2016 |
| Valencia 1 Solar CA | Imperial | 3.0 MW | 1 | 2017 |
| Valencia 2 | Imperial | 3.0 MW | 1 | 2020 |
| Valencia 3 | Imperial | 3.0 MW | 1 | 2021 |
| Visalia CSG LLC | Tulare | 3.0 MW | 1 | 2024 |
| Westmont 300B | Los Angeles | 3.0 MW | 1 | 2016 |
| Weymouth Solar Plant | Los Angeles | 3.0 MW | 2 | 2016 |
| Wonderful Orchards - West Valley | Kern | 3.0 MW | 1 | 2020 |
| Amazon - SAN5 | San Diego | 2.9 MW | 1 | 2025 |
| Dixie Creek Dairy Solar | Kings | 2.9 MW | 1 | 2024 |
| Lindberg FIeld Solar | San Diego | 2.9 MW | 3 | 2015 |
| Lone Oak | Kings | 2.9 MW | 1 | 2023 |
| National Raisin | Fresno | 2.9 MW | 4 | 2015 |
| SMUD at Fleshman | Sacramento | 2.9 MW | 1 | 2011 |
| SMUD at Van Conett | Sacramento | 2.9 MW | 1 | 2011 |
| San Diego - EMDF at San Diego | San Diego | 2.9 MW | 1 | 2021 |
| Sun Pacific - Lerdo | Kern | 2.9 MW | 1 | 2020 |
| Ventura Solar | Ventura | 2.9 MW | 1 | 2021 |
| WPR RE Holdings | Kern | 2.9 MW | 1 | 2026 |
| Westmont 300A | Los Angeles | 2.9 MW | 1 | 2017 |
| Westmont 401 | Los Angeles | 2.9 MW | 1 | 2017 |
| Bishop Ranch - BR 2600 | Contra Costa | 2.8 MW | 3 | 2025 |
| CA - Fresno County - Juvenile Hall | Fresno | 2.8 MW | 1 | 2022 |
| Gilead Sciences La Verne Rooftop Solar | Los Angeles | 2.8 MW | 2 | 2021 |
| Tipton 2 - (CA) | Tulare | 2.8 MW | 2 | 2024 |
| Wonderful Citrus - Delano | Kern | 2.8 MW | 1 | 2014 |
| Chambers 4 - Sacramento SMF1 | Sacramento | 2.7 MW | 1 | 2018 |
| City of Hayward WWTP | Alameda | 2.7 MW | 2 | 2010 |
| Dept of General Services -FTB | Sacramento | 2.7 MW | 1 | 2017 |
| Niagara Bottling Ontario PHI | San Bernardino | 2.7 MW | 1 | 2023 |
| Rio Vista Solar | Solano | 2.7 MW | 1 | 2025 |
| Tracy Linne | San Joaquin | 2.7 MW | 2 | 2026 |
| 20333 Normandie PV, LLC | Los Angeles | 2.6 MW | 1 | 2021 |
| Amazon - Stockton - Roof (SCK1) - (CA) | San Joaquin | 2.6 MW | 1 | 2023 |
| CA - Amazon - SMF6 | Sacramento | 2.6 MW | 1 | 2025 |
| CA - Ventura Co CCD - Moorpark College | Ventura | 2.6 MW | 1 | 2023 |
| Danell Bros Inc | Kings | 2.6 MW | 1 | 2021 |
| ESCA-LL-COLTON, LLC | San Bernardino | 2.6 MW | 1 | 2021 |
| Grossmont College | San Diego | 2.6 MW | 1 | 2023 |
| IGS SBD1 | San Bernardino | 2.6 MW | 1 | 2023 |
| Reedley Community College Solar | Fresno | 2.6 MW | 1 | 2018 |
| Riverside Community College | Riverside | 2.6 MW | 2 | 2025 |
| Thermo Fisher Pleasanton | Alameda | 2.6 MW | 2 | 2025 |
| Amazon - Patterson PV | Stanislaus | 2.5 MW | 1 | 2017 |
| CA-Ventura County CCD-Ventura College | Ventura | 2.5 MW | 1 | 2025 |
| Cawelo Water District Solar | Kern | 2.5 MW | 1 | 2023 |
| Colton Solar One, LLC | San Bernardino | 2.5 MW | 1 | 2015 |
| Gridley Main Two | Butte | 2.5 MW | 1 | 2013 |
| IGS SBD2 | San Bernardino | 2.5 MW | 1 | 2023 |
| North Kern 1 | Kern | 2.5 MW | 1 | 2023 |
| North Kern 2 | Kern | 2.5 MW | 1 | 2024 |
| North Palm Springs 1A | Riverside | 2.5 MW | 1 | 2012 |
| PAC Aviation Solar | Los Angeles | 2.5 MW | 1 | 2024 |
| PSREC/SIAD Solar | Lassen | 2.5 MW | 1 | 2018 |
| Pacific Aviation | Los Angeles | 2.5 MW | 1 | 2025 |
| SSI West Riverside Landfill LLC | Riverside | 2.5 MW | 1 | 2020 |
| Tesoro RV & Boat Storage | San Joaquin | 2.5 MW | 1 | 2026 |
| Valley Center 1 | San Diego | 2.5 MW | 1 | 2013 |
| Cabrillo College | Santa Cruz | 2.4 MW | 1 | 2023 |
| Chambers 4 - Eastvale LGB3 | Riverside | 2.4 MW | 1 | 2019 |
| Chambers 4 - Riverside LGB6 | Riverside | 2.4 MW | 1 | 2018 |
| Department of Justice | Sacramento | 2.4 MW | 1 | 2020 |
| EMWD - Moreno Valley RWRF | Riverside | 2.4 MW | 1 | 2021 |
| Gap Pacific Distribution Center | Fresno | 2.4 MW | 4 | 2008 |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | San Diego | 2.4 MW | 2 | 2024 |
| IPC 25 Solar | San Joaquin | 2.4 MW | 1 | 2024 |
| Kern Sunset 1886-WD | Kern | 2.4 MW | 1 | 2024 |
| POM Plant 1 | Fresno | 2.4 MW | 1 | 2021 |
| Van der Hoek Solar Array/ Dairy | Fresno | 2.4 MW | 1 | 2017 |
| Bio-Rad | Contra Costa | 2.3 MW | 1 | 2021 |
| CSP Los Angeles | Los Angeles | 2.3 MW | 1 | 2022 |
| DGS Valley State Prison | Madera | 2.3 MW | 1 | 2021 |
| DGS Wasco State Prison | Kern | 2.3 MW | 1 | 2020 |
| Desert Hot Springs Solar | Riverside | 2.3 MW | 1 | 2013 |
| Highway 43 1887-WD | Kern | 2.3 MW | 1 | 2024 |
| Las Positas College | Alameda | 2.3 MW | 1 | 2018 |
| Sutter Home Winery Westside | San Joaquin | 2.3 MW | 1 | 2025 |
| Target Woodland Solar Project | Yolo | 2.3 MW | 1 | 2018 |
| Valley Center | San Diego | 2.3 MW | 1 | 2016 |
| Verizon Comms Garage Top Solar Project | Santa Clara | 2.3 MW | 1 | 2025 |
| Walnut Unified School District Walnut HS | Los Angeles | 2.3 MW | 2 | 2020 |
| Westmont 400A | Los Angeles | 2.3 MW | 1 | 2017 |
| Wonderful Nursery | Kern | 2.3 MW | 1 | 2021 |
| AEDG CA I, LLC | Kern | 2.2 MW | 1 | 2025 |
| AVI Bakersfield | Kern | 2.2 MW | 1 | 2022 |
| Aerojet II | Sacramento | 2.2 MW | 1 | 2010 |
| CA Dept of Public Health at Richmond | Contra Costa | 2.2 MW | 1 | 2017 |
| CA-DGS-California Men's Colony | San Luis Obispo | 2.2 MW | 1 | 2023 |
| Chambers 4 - Rialto LGB8 | San Bernardino | 2.2 MW | 1 | 2018 |
| D'Arrigo Brothers - Phase 4 | Monterey | 2.2 MW | 2 | 2019 |
| Gilead Oceanside Solar Project | San Diego | 2.2 MW | 2 | 2021 |
| Google Moffett Park Solar Project | Santa Clara | 2.2 MW | 3 | 2021 |
| Hellyer Solar Farm | Santa Clara | 2.2 MW | 1 | 2017 |
| SCCCD - Fresno Community College | Fresno | 2.2 MW | 1 | 2018 |
| Westmont 400B | Los Angeles | 2.2 MW | 1 | 2017 |
| Anaheim Solar Energy Plant | Orange | 2.1 MW | 1 | 2014 |
| County of San Diego COC Hybrid | San Diego | 2.1 MW | 2 | 2020 |
| Superior Almond Hulling | Fresno | 2.1 MW | 1 | 2024 |
| Arrache 4006 | Los Angeles | 2.0 MW | 2 | 2013 |
| Bodega Avenue Solar LLC | Sonoma | 2.0 MW | 2 | 2021 |
| CA - DGS RFP - RJ Donovan State Prison | San Bernardino | 2.0 MW | 1 | 2024 |
| CA-DGS RFP-Pleasant Valley State Prison | Fresno | 2.0 MW | 1 | 2024 |
| Chambers 4 - San Bernardino SNA7 | San Bernardino | 2.0 MW | 1 | 2018 |
| Corcoran Irrigation District | Kings | 2.0 MW | 1 | 2019 |
| DGS Central California Womens Facility | Madera | 2.0 MW | 1 | 2020 |
| DSH (CA) - Coalinga State Hospital | Fresno | 2.0 MW | 1 | 2014 |
| Dulles | Riverside | 2.0 MW | 1 | 2016 |
| Expressway Solar A | San Bernardino | 2.0 MW | 1 | 2014 |
| Expressway Solar B | San Bernardino | 2.0 MW | 1 | 2014 |
| Freeway Springs | Los Angeles | 2.0 MW | 1 | 2016 |
| Grassland 1&2 Solar Project | Yolo | 2.0 MW | 1 | 2013 |
| Grassland 3&4 Solar Project | Yolo | 2.0 MW | 1 | 2013 |
| Kama 1 LLC | Mendocino | 2.0 MW | 2 | 2026 |
| Maclay Solar Project | Los Angeles | 2.0 MW | 1 | 2017 |
| OK Produce Fresno Carport | Fresno | 2.0 MW | 1 | 2019 |
| One Ten Partners PV | Los Angeles | 2.0 MW | 1 | 2017 |
| Preferred Freezer San Leandro | Alameda | 2.0 MW | 1 | 2017 |
| Putah Creek Solar Farm | Yolo | 2.0 MW | 1 | 2014 |
| Ramona 1 | San Diego | 2.0 MW | 1 | 2013 |
| SEPV 1 | Los Angeles | 2.0 MW | 1 | 2012 |
| SEPV 18 | Los Angeles | 2.0 MW | 1 | 2016 |
| SEPV 2 | San Bernardino | 2.0 MW | 1 | 2012 |
| SEPV Imperial Dixieland East | Imperial | 2.0 MW | 1 | 2016 |
| Shasta College PH2 Solar Project | Shasta | 2.0 MW | 2 | 2026 |
| Soboba Community Solar Project | Riverside | 2.0 MW | 2 | 2016 |
| Solar Star California II LLC | Sacramento | 2.0 MW | 1 | 2012 |
| Soscol Ferry Solar | Napa | 2.0 MW | 2 | 2020 |
| Sunny Cow Solar, LLC | Kern | 2.0 MW | 1 | 2023 |
| Trona Solar III | Inyo | 2.0 MW | 1 | 2023 |
| Vaca Dixon Solar Station | Solano | 2.0 MW | 1 | 2009 |
| Watts 3115 | San Bernardino | 2.0 MW | 2 | 2013 |
| West Tambo Clean Power II | Merced | 2.0 MW | 1 | 2024 |
| Westside Solar Power PV1 | Kings | 2.0 MW | 1 | 2016 |
| BBARWA | San Bernardino | 1.9 MW | 2 | 2021 |
| CSUF Nutwood Solar | Orange | 1.9 MW | 1 | 2016 |
| California City | Kern | 1.9 MW | 1 | 2018 |
| Chambers 4 - Redland LGB4 | San Bernardino | 1.9 MW | 1 | 2019 |
| Gavilan Community College Solar Project | Santa Clara | 1.9 MW | 2 | 2018 |
| Lafayette 2 - Internal Services Dept | Los Angeles | 1.9 MW | 1 | 2020 |
| Lindberg Field Solar 2 | San Diego | 1.9 MW | 1 | 2017 |
| Lost Hills Oilfield | Kern | 1.9 MW | 1 | 2021 |
| Palm Springs DAC PV | Riverside | 1.9 MW | 2 | 2021 |
| Pierce College | Los Angeles | 1.9 MW | 1 | 2013 |
| Shelter Creek Condominiums Solar | San Mateo | 1.9 MW | 1 | 2020 |
| Xebec 1 | Los Angeles | 1.9 MW | 1 | 2018 |
| Alta Sea | Los Angeles | 1.8 MW | 1 | 2023 |
| Bishop Ranch - BR 1-Y | Contra Costa | 1.8 MW | 4 | 2022 |
| Bob Wiley Detention Center | Tulare | 1.8 MW | 1 | 2020 |
| Broadway 3 - UCSB Lot 38 | Santa Barbara | 1.8 MW | 1 | 2016 |
| CPA Wilmington 1 | Los Angeles | 1.8 MW | 1 | 2025 |
| Central San | Contra Costa | 1.8 MW | 1 | 2025 |
| City of Long Beach Airport Lot A & B | Los Angeles | 1.8 MW | 1 | 2024 |
| Fresno Sunnyside High School Hybrid | Fresno | 1.8 MW | 2 | 2020 |
| GreenStruxure BBU004, LLC | Los Angeles | 1.8 MW | 2 | 2023 |
| POM Beverage Solar | Fresno | 1.8 MW | 1 | 2021 |
| Prairie | Los Angeles | 1.8 MW | 1 | 2021 |
| RP Minnesota Solar | Ventura | 1.8 MW | 1 | 2026 |
| Rancho Cucamonga Dist #1 | San Bernardino | 1.8 MW | 1 | 2015 |
| San Diego - NCRC at Vista | San Diego | 1.8 MW | 1 | 2021 |
| Santa Fe Springs Rooftop Solar BLDG M | Los Angeles | 1.8 MW | 1 | 2015 |
| VS RXI Mason-Chatsworth, LLC | Los Angeles | 1.8 MW | 1 | 2023 |
| Westmont 301 | Los Angeles | 1.8 MW | 1 | 2017 |
| CSU San Jose State University | Santa Clara | 1.7 MW | 1 | 2021 |
| Guadalupe Solar Farm | Santa Clara | 1.7 MW | 1 | 2018 |
| IPC 16 - SLCVA516 | San Joaquin | 1.7 MW | 1 | 2026 |
| KP Ontario Vineyard Solar | San Bernardino | 1.7 MW | 1 | 2024 |
| KP South Sacramento Hospital Solar | Sacramento | 1.7 MW | 1 | 2023 |
| Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles | 1.7 MW | 1 | 2020 |
| Open Sky Dairy | Fresno | 1.7 MW | 1 | 2024 |
| Open Sky Ranch Inc | Fresno | 1.7 MW | 1 | 2024 |
| Renew Solar ABC Sacramento LLC | Sacramento | 1.7 MW | 1 | 2020 |
| Agriculture Capital - Legacy Packing | Tulare | 1.6 MW | 1 | 2022 |
| Broadway 4 - Target Shafter | Kern | 1.6 MW | 1 | 2018 |
| CA-DGS- RFP-Correctional Training Fac | Monterey | 1.6 MW | 1 | 2024 |
| CBS Television City | Los Angeles | 1.6 MW | 1 | 2013 |
| CFW Solar X LLC - Vaughn | Los Angeles | 1.6 MW | 1 | 2018 |
| EMWD - Sun City RWRF | Riverside | 1.6 MW | 1 | 2021 |
| Firestone Walker Brewery - Phase 1 | San Luis Obispo | 1.6 MW | 1 | 2020 |
| Fresno Bullard High School Hybrid | Fresno | 1.6 MW | 2 | 2020 |
| Gilead Foster City Solar Project | San Mateo | 1.6 MW | 3 | 2021 |
| POM Plant 2 | Fresno | 1.6 MW | 1 | 2021 |
| Robert O Schulz Solar Farm | Stanislaus | 1.6 MW | 2 | 2008 |
| 20701 Plummer PV, LLC | Los Angeles | 1.5 MW | 1 | 2022 |
| 2097 Helton Solar Project | Merced | 1.5 MW | 1 | 2014 |
| Adapture CA2, LLC | Glenn | 1.5 MW | 1 | 2016 |
| Arrache 4013 | Los Angeles | 1.5 MW | 1 | 2013 |
| Bear Creek Solar (Lodi) | San Joaquin | 1.5 MW | 1 | 2014 |
| Bishop Ranch - BR 8-O | Contra Costa | 1.5 MW | 2 | 2025 |
| Bishop Ranch - BR 8-P | Contra Costa | 1.5 MW | 2 | 2024 |
| Blue Shld Of Cal- El Dorado Hlls Mtr B | El Dorado | 1.5 MW | 1 | 2019 |
| CA-Ventura Co CCD-Oxnard College Canopy | Ventura | 1.5 MW | 1 | 2022 |
| CDCR (CA) - Wasco State Prison | Kern | 1.5 MW | 1 | 2013 |
| Castor Solar | Kern | 1.5 MW | 1 | 2016 |
| Chambers 4 - Eastvale DCA2 | Riverside | 1.5 MW | 1 | 2018 |
| City of Atwater NEM | Merced | 1.5 MW | 1 | 2024 |
| Civic Center East | Tulare | 1.5 MW | 1 | 2020 |
| Cloverdale Solar I | Sonoma | 1.5 MW | 1 | 2014 |
| Coronus Adelanto West 1 | San Bernardino | 1.5 MW | 1 | 2015 |
| Coronus Adelanto West 2 | San Bernardino | 1.5 MW | 1 | 2015 |
| Division 1 | Los Angeles | 1.5 MW | 1 | 2014 |
| El Dorado County | El Dorado | 1.5 MW | 1 | 2021 |
| El Dorado Solar, LLC | El Dorado | 1.5 MW | 1 | 2021 |
| Enerparc CA1 LLC | San Benito | 1.5 MW | 1 | 2014 |
| Expressway Solar C2 | San Bernardino | 1.5 MW | 1 | 2014 |
| Heliocentric | Los Angeles | 1.5 MW | 1 | 2012 |
| Henry Miller RD | Merced | 1.5 MW | 1 | 2018 |
| Hesperia | San Bernardino | 1.5 MW | 1 | 2014 |
| Hollister Solar LLC | San Benito | 1.5 MW | 1 | 2014 |
| Horn | Los Angeles | 1.5 MW | 1 | 2013 |
| IKEA Tejon 345 | Kern | 1.5 MW | 1 | 2011 |
| Industry MetroLink PV 1 | Los Angeles | 1.5 MW | 1 | 2012 |
| Industry Solar Power Generation Station | San Bernardino | 1.5 MW | 1 | 2013 |
| JD Foods - JD Foods | Fresno | 1.5 MW | 1 | 2020 |
| L-8 Solar Project | Los Angeles | 1.5 MW | 1 | 2012 |
| La Joya Del Sol | Fresno | 1.5 MW | 1 | 2012 |
| Lancaster Solar 1 | Los Angeles | 1.5 MW | 1 | 2014 |
| Lancaster Solar 2 | Los Angeles | 1.5 MW | 1 | 2014 |
| Lemoore 1 | Kings | 1.5 MW | 1 | 2016 |
| Liberty HS Solar Project | Kern | 1.5 MW | 1 | 2018 |
| Ma | Los Angeles | 1.5 MW | 1 | 2013 |
| Madera 1 PV | Madera | 1.5 MW | 1 | 2017 |
| Merced Solar LLC | Merced | 1.5 MW | 1 | 2014 |
| Mission Solar LLC | Merced | 1.5 MW | 1 | 2014 |
| Mitchell Solar, LLC | San Bernardino | 1.5 MW | 1 | 2014 |
| Morgan Lancaster 1 | Los Angeles | 1.5 MW | 1 | 2015 |
| Navajo Solar Power Generation Station 1 | San Bernardino | 1.5 MW | 1 | 2013 |
| Nickel 1 Solar Facility | Kern | 1.5 MW | 1 | 2012 |
| Oakley Solar Project | Contra Costa | 1.5 MW | 1 | 2013 |
| Oltmans SCE at Jurupa | San Bernardino | 1.5 MW | 1 | 2013 |
| Otoe Solar Power Generation Station 1 LL | San Bernardino | 1.5 MW | 1 | 2013 |
| POM Juice Solar | Fresno | 1.5 MW | 1 | 2021 |
| Park Meridian #1 | Riverside | 1.5 MW | 1 | 2015 |
| Powhatan Solar Power Generation Station | San Bernardino | 1.5 MW | 1 | 2013 |
| Radiance Solar 4 | Los Angeles | 1.5 MW | 1 | 2013 |
| Radiance Solar 5 | Los Angeles | 1.5 MW | 1 | 2013 |
| Rodeo Solar C2 | Los Angeles | 1.5 MW | 1 | 2014 |
| Rodeo Solar D2 | Los Angeles | 1.5 MW | 1 | 2014 |
| Rudy Solar, LLC | San Bernardino | 1.5 MW | 1 | 2014 |
| SCE-Snowline-Duncan Road (North) | San Bernardino | 1.5 MW | 1 | 2014 |
| SCE-Snowline-White Rd (Central) | San Bernardino | 1.5 MW | 1 | 2014 |
| SCE-Snowline-White Road (North) | San Bernardino | 1.5 MW | 1 | 2014 |
| SCE-Snowline-White Road (South) | San Bernardino | 1.5 MW | 1 | 2014 |
| San Antonio West Solar Rooftop | Riverside | 1.5 MW | 1 | 2012 |
| Santa Fe Springs Rooftop Solar BLDG H | Los Angeles | 1.5 MW | 1 | 2015 |
| Sonora 1 | Tuolumne | 1.5 MW | 1 | 2013 |
| Summer Solar A2 | Los Angeles | 1.5 MW | 1 | 2014 |
| Summer Solar B2 | Los Angeles | 1.5 MW | 1 | 2014 |
| Summer Solar C2 | Los Angeles | 1.5 MW | 1 | 2014 |
| Sun Harvest Solar NDP1 | Merced | 1.5 MW | 1 | 2015 |
| Temescal Canyon RV, LLC | Riverside | 1.5 MW | 1 | 2011 |
| Terra Francesco | San Bernardino | 1.5 MW | 1 | 2015 |
| Vacaville Hospital | Solano | 1.5 MW | 1 | 2019 |
| Venable Solar 1 | Riverside | 1.5 MW | 1 | 2015 |
| Venable Solar 2 | Riverside | 1.5 MW | 1 | 2015 |
| Victor Mesa Linda B2 | San Bernardino | 1.5 MW | 1 | 2014 |
| Victor Mesa Linda C2 | San Bernardino | 1.5 MW | 1 | 2014 |
| Victor Mesa Linda D2 | San Bernardino | 1.5 MW | 1 | 2014 |
| Victor Mesa Linda E2 | San Bernardino | 1.5 MW | 1 | 2014 |
| Vinam | Los Angeles | 1.5 MW | 1 | 2013 |
| Vintner Solar | San Luis Obispo | 1.5 MW | 1 | 2014 |
| Windsor Floating Solar | Sonoma | 1.5 MW | 1 | 2020 |
| Wingmaster | Kern | 1.5 MW | 1 | 2025 |
| Wonderful Huller & Shelling | Kern | 1.5 MW | 1 | 2021 |
| Zonneveld Oak Grove | Fresno | 1.5 MW | 1 | 2024 |
| Bakersfield 111 | Kern | 1.4 MW | 1 | 2015 |
| Beringer | Sonoma | 1.4 MW | 1 | 2009 |
| Bishop Ranch BR 1-X | Contra Costa | 1.4 MW | 3 | 2022 |
| Fremont - Kato Rd | Alameda | 1.4 MW | 2 | 2016 |
| Fresno Hoover High School Hybrid | Fresno | 1.4 MW | 2 | 2020 |
| Frontier HS Solar Project | Kern | 1.4 MW | 1 | 2018 |
| Grossmont HS Solar Project | San Diego | 1.4 MW | 1 | 2018 |
| Legoland CA Phase I | San Diego | 1.4 MW | 1 | 2025 |
| Moonlight Packing - Phase 2 | Fresno | 1.4 MW | 1 | 2019 |
| North Juvenile Detention Center Solar | Tulare | 1.4 MW | 2 | 2019 |
| Sacramento (SMUD) | Sacramento | 1.4 MW | 1 | 2014 |
| VS BC Pacific Gateway, LLC | Los Angeles | 1.4 MW | 1 | 2025 |
| Vallecitos Water District | San Diego | 1.4 MW | 1 | 2021 |
| Vulcan San Emidio Solar | Kern | 1.4 MW | 1 | 2023 |
| 2127 Harris Solar Project | Butte | 1.3 MW | 1 | 2014 |
| 9150 Hermosa Solar GM | San Bernardino | 1.3 MW | 1 | 2022 |
| Aerolease | Los Angeles | 1.3 MW | 1 | 2018 |
| Bayer Oxnard - Meter# 4719 | Ventura | 1.3 MW | 1 | 2026 |
| Building F | Los Angeles | 1.3 MW | 1 | 2016 |
| CSD 2 - Heritage High | Contra Costa | 1.3 MW | 1 | 2013 |
| CSU Northridge Plant | Los Angeles | 1.3 MW | 3 | 2003 |
| CSU Sacramento I | Sacramento | 1.3 MW | 1 | 2023 |
| Calibrant Bakersfield LLC | Kern | 1.3 MW | 1 | 2022 |
| Colon PV | Los Angeles | 1.3 MW | 1 | 2015 |
| County of San Diego SBRC | San Diego | 1.3 MW | 1 | 2018 |
| Deer Creek 2 | El Dorado | 1.3 MW | 1 | 2021 |
| Diamond Valley Solar Project | Riverside | 1.3 MW | 1 | 2015 |
| EMWD - San Jacinto RWRF NEM | Riverside | 1.3 MW | 1 | 2021 |
| Folsom SP and CSP Sacramento | Sacramento | 1.3 MW | 1 | 2019 |
| Forever 21 Retail, Inc. | Los Angeles | 1.3 MW | 1 | 2015 |
| Golden Springs Building D | Los Angeles | 1.3 MW | 1 | 2012 |
| Harris Farms Solar Facility | Fresno | 1.3 MW | 1 | 2024 |
| Pivot Energy PPA 22 | Tulare | 1.3 MW | 1 | 2024 |
| Sacramento Point West Medical Offices | Sacramento | 1.3 MW | 1 | 2020 |
| Solar Star Palo Alto I, LLC | Santa Clara | 1.3 MW | 1 | 2019 |
| Sutter Santa Rosa Solar | Sonoma | 1.3 MW | 1 | 2019 |
| Tejon Castac Water District Solar | Kern | 1.3 MW | 1 | 2024 |
| Tranquillity ID | Fresno | 1.3 MW | 1 | 2018 |
| West Village Solar - Array 2 Community S | Yolo | 1.3 MW | 1 | 2022 |
| 2081 Terzian Solar Project | Fresno | 1.2 MW | 1 | 2014 |
| ASTI | Sonoma | 1.2 MW | 1 | 2009 |
| Allied Potato | Kern | 1.2 MW | 1 | 2025 |
| Alticor Inc - Solar Project | Orange | 1.2 MW | 1 | 2017 |
| Bishop Ranch - BR 8-Q | Contra Costa | 1.2 MW | 2 | 2025 |
| Bolthouse S&P and Rowen Farms Solar | Los Angeles | 1.2 MW | 4 | 2008 |
| Building G | Los Angeles | 1.2 MW | 1 | 2016 |
| CA - Madera USD - Madera South HS | Madera | 1.2 MW | 1 | 2023 |
| CDCR (CA) - Pleasant Valley State Prison | Fresno | 1.2 MW | 1 | 2014 |
| Camp San Luis Obispo | San Luis Obispo | 1.2 MW | 1 | 2024 |
| Case Vander Eyk, Jr Dairy Solar | Tulare | 1.2 MW | 1 | 2023 |
| Francisco St. Solar | Los Angeles | 1.2 MW | 1 | 2018 |
| Golden Springs Building C-1 | Los Angeles | 1.2 MW | 1 | 2012 |
| Kern Co Sheriff | Kern | 1.2 MW | 2 | 2025 |
| Kern Del Oro | Kern | 1.2 MW | 1 | 2024 |
| Kroger La Habra | Orange | 1.2 MW | 1 | 2020 |
| Los Angeles Harbor College | Los Angeles | 1.2 MW | 1 | 2010 |
| PFMG Solar Grossmont Helix LLC | San Diego | 1.2 MW | 1 | 2018 |
| Palo Verde College | Riverside | 1.2 MW | 1 | 2009 |
| Phelan Pinon Hills CSD Solar | San Bernardino | 1.2 MW | 1 | 2015 |
| SCCCD - Clovis Community College | Fresno | 1.2 MW | 1 | 2018 |
| Santa Rosa Junior College Petaluma Solar | Sonoma | 1.2 MW | 1 | 2018 |
| TWC | Tulare | 1.2 MW | 1 | 2024 |
| West Village Solar - Array 1Community So | Yolo | 1.2 MW | 1 | 2022 |
| Atascadero State Hospital | San Luis Obispo | 1.1 MW | 1 | 2020 |
| Bakersfield College Solar 01 | Kern | 1.1 MW | 1 | 2010 |
| CDCR (CA) - Solano State Prison | Solano | 1.1 MW | 1 | 2013 |
| Chatsworth Industrial Center 1-SLLAX601 | Los Angeles | 1.1 MW | 1 | 2025 |
| Corcoran | Kings | 1.1 MW | 1 | 2014 |
| Donaghy-Stockton | San Joaquin | 1.1 MW | 1 | 2021 |
| Dover Dairy | Kings | 1.1 MW | 1 | 2022 |
| Government Plaza Solar | Tulare | 1.1 MW | 1 | 2020 |
| ISH Solar Hospital Downey | Los Angeles | 1.1 MW | 1 | 2011 |
| ISH Solar Hospital SDMC | San Diego | 1.1 MW | 1 | 2011 |
| Improvement Dst No. 4 | Kern | 1.1 MW | 1 | 2009 |
| Kilroy Solar | San Diego | 1.1 MW | 1 | 2018 |
| Meridian Vineyards | San Luis Obispo | 1.1 MW | 2 | 2010 |
| Metro Support Services Center Solar | Los Angeles | 1.1 MW | 1 | 2005 |
| Mountain View Ind Park 1-sline001 | San Bernardino | 1.1 MW | 1 | 2023 |
| Port of LA Solar FiT Project | Los Angeles | 1.1 MW | 1 | 2015 |
| Rancho Cordova Medical Offices | Sacramento | 1.1 MW | 1 | 2021 |
| San Diego Sockers | San Diego | 1.1 MW | 2 | 2025 |
| SeaWorld Aquatica | San Diego | 1.1 MW | 1 | 2018 |
| South County Detention Center Solar | Tulare | 1.1 MW | 1 | 2019 |
| Staples La Mirada, CA | Los Angeles | 1.1 MW | 1 | 2010 |
| Stockton 6 - SLEBA202 | San Joaquin | 1.1 MW | 1 | 2026 |
| Sutter Home Winery GIR | Napa | 1.1 MW | 1 | 2023 |
| Sutter Home Winery TCC | San Luis Obispo | 1.1 MW | 1 | 2024 |
| US GSA - Sacramento | Sacramento | 1.1 MW | 1 | 2018 |
| 2555 E Olympic Bl | Los Angeles | 1.0 MW | 1 | 2012 |
| Bakersfield Industrial PV 1 | Kern | 1.0 MW | 1 | 2017 |
| Blue Moon Farms | Tulare | 1.0 MW | 1 | 2024 |
| Blue Skies Solar, LLC | Kern | 1.0 MW | 1 | 2021 |
| Broadway 3 - UC Merced 1 | Merced | 1.0 MW | 1 | 2009 |
| Buidling L | Los Angeles | 1.0 MW | 1 | 2016 |
| CA Institute for Women | San Bernardino | 1.0 MW | 1 | 2020 |
| CA- US Foods- Sacramento (McClellan) | Sacramento | 1.0 MW | 1 | 2025 |
| CPA 2132 E Dominguez | Los Angeles | 1.0 MW | 1 | 2025 |
| CSU Fresno Solar Project | Fresno | 1.0 MW | 2 | 2007 |
| CSUF State College | Orange | 1.0 MW | 1 | 2016 |
| California PV Energy at ISD WWTP | Contra Costa | 1.0 MW | 1 | 2014 |
| Castle Rock Vineyards | Tulare | 1.0 MW | 1 | 2010 |
| Catalina Express | Los Angeles | 1.0 MW | 1 | 2020 |
| Chuckawalla Valley State Prison | Riverside | 1.0 MW | 1 | 2006 |
| City of Madera WWTP | Madera | 1.0 MW | 1 | 2009 |
| City of Rosamond (CA) | Kern | 1.0 MW | 1 | 2023 |
| Cloverdale Solar Center | Sonoma | 1.0 MW | 1 | 2019 |
| Clovis East High School | Fresno | 1.0 MW | 1 | 2018 |
| Clovis High School | Fresno | 1.0 MW | 1 | 2018 |
| Clovis North High School | Fresno | 1.0 MW | 1 | 2017 |
| Colton Solar Two, LLC | San Bernardino | 1.0 MW | 1 | 2015 |
| Cottonwood Solar, LLC Cottonwood Carport | Marin | 1.0 MW | 1 | 2016 |
| Crossroads Bus Park 7 - SLINE207 | San Bernardino | 1.0 MW | 1 | 2025 |
| Crown Cooling Facility | Imperial | 1.0 MW | 1 | 2011 |
| Da Silva Dairy | San Joaquin | 1.0 MW | 1 | 2022 |
| Delano Land 1 | Kern | 1.0 MW | 1 | 2017 |
| Delta Electronics Fremont | Alameda | 1.0 MW | 2 | 2016 |
| Dinuba Wastewater Treatment Plant | Tulare | 1.0 MW | 1 | 2011 |
| Division 2 | Los Angeles | 1.0 MW | 1 | 2014 |
| Division 3 | Los Angeles | 1.0 MW | 1 | 2014 |
| Dos Palos Cooperative Gin | Merced | 1.0 MW | 1 | 2022 |
| E&B Resources | Kern | 1.0 MW | 1 | 2013 |
| EAFB - North Base | Kern | 1.0 MW | 1 | 2012 |
| EAFB - South Base | Kern | 1.0 MW | 1 | 2012 |
| ELACC Photovoltaic Power Facility | Los Angeles | 1.0 MW | 2 | 2008 |
| Elkhorn Dairy | Tulare | 1.0 MW | 1 | 2009 |
| FAA NorCal TRACON | Sacramento | 1.0 MW | 1 | 2012 |
| FRV SI Transport Solar LP | Sacramento | 1.0 MW | 1 | 2010 |
| FTF-PackingShed | Tulare | 1.0 MW | 1 | 2013 |
| Firebaugh-CCS-PV-1 | Fresno | 1.0 MW | 1 | 2015 |
| Five H Farms Solar Array | Merced | 1.0 MW | 1 | 2021 |
| Green Acres Solar Facility 2 | Sacramento | 1.0 MW | 1 | 2012 |
| Gridley Main | Butte | 1.0 MW | 1 | 2013 |
| Hollister Wastewater Facility | San Benito | 1.0 MW | 1 | 2011 |
| Intel Folsom | Sacramento | 1.0 MW | 2 | 2010 |
| Intel Folsom Phase 2 | Sacramento | 1.0 MW | 1 | 2012 |
| Kettering Solar 1 | Los Angeles | 1.0 MW | 1 | 2014 |
| Kettering Solar 2 | Los Angeles | 1.0 MW | 1 | 2014 |
| Kettleman Solar Project | San Joaquin | 1.0 MW | 1 | 2014 |
| Kohls San Bernardino Solar Facility | San Bernardino | 1.0 MW | 1 | 2007 |
| Lake Elsinore Canopies - Lakeside HS | Riverside | 1.0 MW | 1 | 2022 |
| Lancaster Baptist Church | Los Angeles | 1.0 MW | 1 | 2011 |
| Las Virgenes Municipal Water District | Los Angeles | 1.0 MW | 1 | 2014 |
| Lavio Solar | Sonoma | 1.0 MW | 1 | 2018 |
| Madelyn Solar, LLC | San Bernardino | 1.0 MW | 1 | 2014 |
| Madera Community Hospital | Madera | 1.0 MW | 1 | 2011 |
| Manteca Land PV | San Joaquin | 1.0 MW | 1 | 2017 |
| Mariani Packing Vacaville Solar | Solano | 1.0 MW | 1 | 2008 |
| Marina South | Los Angeles | 1.0 MW | 1 | 2020 |
| Medline Ind. Phase 2 Tracy | San Joaquin | 1.0 MW | 1 | 2018 |
| Monterey Regional Water Pollution Contro | Monterey | 1.0 MW | 1 | 2010 |
| Niagara Bottling Stockton | San Joaquin | 1.0 MW | 1 | 2018 |
| North Bay Solar 1 | Solano | 1.0 MW | 1 | 2013 |
| Nunn | San Bernardino | 1.0 MW | 1 | 2013 |
| Oaks HOA | Amador | 1.0 MW | 1 | 2025 |
| Occidental College Solar Project | Los Angeles | 1.0 MW | 1 | 2013 |
| Oltmans SCE at Champagne | San Bernardino | 1.0 MW | 1 | 2013 |
| Owens Valley Solar Project 11 | Inyo | 1.0 MW | 1 | 2016 |
| Pacific Cruise Ship Terminals Berth 93 | Los Angeles | 1.0 MW | 1 | 2010 |
| RE-VFO LLC | Tulare | 1.0 MW | 2 | 2009 |
| SCE-Snowline-Duncan Road (South) | San Bernardino | 1.0 MW | 1 | 2014 |
| SDCCD - Miramar | San Diego | 1.0 MW | 1 | 2011 |
| SDCWA - Twin Oaks | San Diego | 1.0 MW | 1 | 2011 |
| SMUD at Lawrence | Sacramento | 1.0 MW | 1 | 2011 |
| Sacramento Fairbain Water Treatment Plan | Sacramento | 1.0 MW | 1 | 2013 |
| Sacramento Soleil LLC | Sacramento | 1.0 MW | 1 | 2008 |
| San Francisco Bay Coffee | Placer | 1.0 MW | 1 | 2014 |
| Stage Gulch Solar | Sonoma | 1.0 MW | 1 | 2018 |
| Strata Roof 1 | Sacramento | 1.0 MW | 1 | 2013 |
| Summer Solar D2 | Los Angeles | 1.0 MW | 1 | 2014 |
| SunE Rochester | San Bernardino | 1.0 MW | 1 | 2016 |
| SunE- E Philadelphia Ontario | San Bernardino | 1.0 MW | 1 | 2016 |
| SunEdison Anheuser Busch Fairfield | Solano | 1.0 MW | 1 | 2008 |
| SunEdison Ironwood State Prison | Riverside | 1.0 MW | 1 | 2008 |
| SunEdison Procter & Gamble Oxnard | Ventura | 1.0 MW | 1 | 2009 |
| SunEdison Walgreens Moreno Valley | Riverside | 1.0 MW | 1 | 2007 |
| SunEdison Walmart Apple Valley DC | San Bernardino | 1.0 MW | 1 | 2009 |
| Tahquitz High School | Riverside | 1.0 MW | 1 | 2012 |
| Tulare Akers Professional Center | Tulare | 1.0 MW | 1 | 2019 |
| USG 1 | Imperial | 1.0 MW | 1 | 2014 |
| USG 2 | Imperial | 1.0 MW | 1 | 2015 |
| Univ of California San Diego Solar | San Diego | 1.0 MW | 1 | 2008 |
| Vacaville | Solano | 1.0 MW | 1 | 2007 |
| Valley Sanitary District WTP Solar | Riverside | 1.0 MW | 1 | 2016 |
| Van der Kooi Dairy Solar Array | Fresno | 1.0 MW | 1 | 2021 |
| Victor Valley CC CPV Solar | San Bernardino | 1.0 MW | 1 | 2010 |
| Walgreens Woodland Distribution Center | Yolo | 1.0 MW | 1 | 2007 |
| West Valley High School Solar | Riverside | 1.0 MW | 1 | 2012 |
| Yolo County Solar Project | Yolo | 1.0 MW | 1 | 2010 |
| CSD 2- Freedom High | Contra Costa | 0.9 MW | 1 | 2013 |
| Dedeaux | Los Angeles | 0.9 MW | 1 | 2019 |
| Nordhoff Place | Los Angeles | 0.9 MW | 1 | 2014 |
| Rialto - High School | San Bernardino | 0.9 MW | 1 | 2017 |
| RE Dillard 4 LLC | Sacramento | 0.4 MW | 1 | 2012 |
| Fremont CA AutoFactory | Alameda | 0.3 MW | 1 | 2022 |