Home / Power plants / California / Angela Solar Project

Angela Solar Project

Battery storage power plant · Tulare County, California

Nameplate capacity
80 MW
Rank in California
#321
of 1,897 plants
In service since
2026
May 2026

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Angiola East LLC
County
Tulare County
Generating units
2
Share of state capacity
0.07%
Rank among battery storage plants in California
#43 of 142
EIA plant code
68854

Generating units

Individual generating units at Angela Solar Project
UnitTechnologyNameplateSummerOnlineStatus
ABESSBatteries40 MW20 MW2026Operating
ANG1Solar Photovoltaic40 MW40 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

StanislausHydro82 MW
Pit 3Hydro80 MW
Bottleneck Energy StorageBattery storage80 MW
Desert Harvest, LLCSolar80 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 80 MW solar plant and a 80 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates