Home / Power plants / California / RE Barren Ridge 1

RE Barren Ridge 1

Solar power plant · Kern County, California

Nameplate capacity
60 MW
Rank in California
#386
of 1,897 plants
In service since
2016
August 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RE Barren Ridge 1, LLC
County
Kern County
Generating units
1
Share of state capacity
0.06%
Rank among solar plants in California
#117 of 937
EIA plant code
60389

Generating units

Individual generating units at RE Barren Ridge 1
UnitTechnologyNameplateSummerOnlineStatus
REBR1Solar Photovoltaic60 MW60 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Five Points Solar ParkSolar60 MW
Goleta Energy Storage, LLCBattery storage60 MW
Regulus Solar ProjectSolar60 MW
Center HybridNatural gas60 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 60 MW solar plant and a 60 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates