Blythe Solar 110, LLC
Battery storage power plant · Riverside County, California
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- Blythe Solar 110, LLC
- County
- Riverside County
- Generating units
- 4
- Share of state capacity
- 0.16%
- Rank among battery storage plants in California
- #18 of 142
- EIA plant code
- 60093
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BES1 | Batteries | 63 MW | 63 MW | 2021 | Operating |
| BLCK1 | Solar Photovoltaic | 39 MW | 39 MW | 2016 | Operating |
| BLCK2 | Solar Photovoltaic | 36 MW | 36 MW | 2016 | Operating |
| BLCK3 | Solar Photovoltaic | 35 MW | 35 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Campbell Power Plant | Natural gas | 174 MW |
| Richmond Cogen | Natural gas | 174 MW |
| Don Pedro | Hydro | 171 MW |
| Lockhart Solar PV, LLC | Solar | 169 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 173 MW solar plant and a 173 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates