Home / Power plants / California / Borden Solar Farm

Borden Solar Farm

Solar power plant · Madera County, California

Nameplate capacity
50 MW
Rank in California
#430
of 1,928 plants
In service since
2020
June 2020

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
41MB 8me, LLC
County
Madera County
Generating units
1
Share of state capacity
0.05%
Rank among solar plants in California
#136 of 968
EIA plant code
59531

Generating units

Individual generating units at Borden Solar Farm
UnitTechnologyNameplateSummerOnlineStatus
BRDNSolar Photovoltaic50 MW50 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Alpaugh 50Solar50 MW
Antelope DSR 1Solar50 MW
Chula Vista Energy Center 2Battery storage50 MW
Combustion Turbine Project No 2Natural gas50 MW

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates