Details
- Primary fuel
- Natural gas
- Technology
- Other Natural Gas
- Operator
- Costco Wholesale
- County
- San Joaquin County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among natural gas plants in California
- #248 of 309
- EIA plant code
- 63638
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| CTC13 | Other Natural Gas | 2.6 MW | 2.6 MW | 2019 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Riverside Community College | Solar | 2.6 MW |
| Thermo Fisher Pleasanton | Solar | 2.6 MW |
| Amazon - Patterson PV | Solar | 2.5 MW |
| CA-Ventura County CCD-Ventura College | Solar | 2.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.6 MW solar plant and a 2.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates