Home / Power plants / California / Tulare BioMAT Fuel Cell

Tulare BioMAT Fuel Cell

Other power plant · Tulare County, California

Nameplate capacity
2.8 MW
Rank in California
#1277
of 1,897 plants
In service since
2019
December 2019

Details

Primary fuel
Other
Technology
Other Waste Biomass
Operator
Central CA Fuel Cell 2, LLC
County
Tulare County
Generating units
1
Share of state capacity
0.00%
Rank among other plants in California
#119 of 152
EIA plant code
61846

Generating units

Individual generating units at Tulare BioMAT Fuel Cell
UnitTechnologyNameplateSummerOnlineStatus
MM27Other Waste Biomass2.8 MW2.8 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.8 MW solar plant and a 2.8 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates