Home / Power plants / California / Deer Creek Hybrid

Deer Creek Hybrid

Solar power plant · Tulare County, California

Nameplate capacity
103 MW
Rank in California
#272
of 1,928 plants
In service since
2026
July 2026

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Deer Creek Solar I, LLC
County
Tulare County
Generating units
2
Share of state capacity
0.09%
Rank among solar plants in California
#100 of 968
EIA plant code
69121

Generating units

Individual generating units at Deer Creek Hybrid
UnitTechnologyNameplateSummerOnlineStatus
DERBABatteries51 MW50 MW2026Operating
DERPVSolar Photovoltaic51 MW50 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

MoccasinHydro104 MW
Pit 4Hydro103 MW
ElectraHydro103 MW
Shiloh III Wind Project LLCWind103 MW

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 103 MW solar plant and a 103 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates