Home / Power plants / California / Oberon Solar Project

Oberon Solar Project

Solar power plant · Riverside County, California

Nameplate capacity
375 MW
Rank in California
#58
of 1,897 plants
In service since
2023
September 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
County
Riverside County
Generating units
2
Share of state capacity
0.35%
Rank among solar plants in California
#12 of 937
EIA plant code
65734

Generating units

Individual generating units at Oberon Solar Project
UnitTechnologyNameplateSummerOnlineStatus
OBIPVSolar Photovoltaic250 MW250 MW2023Operating
OBIBSBatteries125 MW125 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 375 MW solar plant and a 375 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates