Mustang Two
Solar power plant · Kings County, California
Nameplate capacity
150 MW
Rank in California
#186
of 1,897 plants
In service since
2020
November 2020
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- RE Mustang Two LLC
- County
- Kings County
- Generating units
- 2
- Share of state capacity
- 0.14%
- Rank among solar plants in California
- #69 of 937
- EIA plant code
- 62015
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| M2WHI | Solar Photovoltaic | 100 MW | 100 MW | 2020 | Operating |
| M2BAR | Solar Photovoltaic | 50 MW | 50 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Maverick Solar 6, LLC | Solar | 150 MW |
| Mustang Hills LLC | Wind | 150 MW |
| Shiloh I Wind Project | Wind | 150 MW |
| Shiloh Wind Project 2 LLC | Wind | 150 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates