Home / Power plants / California / Mustang Two

Mustang Two

Solar power plant · Kings County, California

Nameplate capacity
150 MW
Rank in California
#186
of 1,897 plants
In service since
2020
November 2020

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RE Mustang Two LLC
County
Kings County
Generating units
2
Share of state capacity
0.14%
Rank among solar plants in California
#69 of 937
EIA plant code
62015

Generating units

Individual generating units at Mustang Two
UnitTechnologyNameplateSummerOnlineStatus
M2WHISolar Photovoltaic100 MW100 MW2020Operating
M2BARSolar Photovoltaic50 MW50 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates