Home / Power plants / California / Eland Solar & Storage Center, Phase 1 Hy

Eland Solar & Storage Center, Phase 1 Hy

Solar power plant · Kern County, California

Nameplate capacity
460 MW
Rank in California
#44
of 1,897 plants
In service since
2024
November 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
68SF 8me LLC
County
Kern County
Generating units
2
Share of state capacity
0.43%
Rank among solar plants in California
#5 of 937
EIA plant code
61168

Generating units

Individual generating units at Eland Solar & Storage Center, Phase 1 Hy
UnitTechnologyNameplateSummerOnlineStatus
68SF8Solar Photovoltaic310 MW200 MW2024Operating
61168Batteries150 MW150 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 460 MW solar plant and a 460 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates