Camino Solar Hybrid

Solar power plant · Kern County, California

Nameplate capacity
44 MW
Rank in California
#493
of 1,897 plants
In service since
2025
April 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Avangrid Power LLC
County
Kern County
Generating units
1
Share of state capacity
0.04%
Rank among solar plants in California
#135 of 937
EIA plant code
63508

Generating units

Individual generating units at Camino Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
CSPV1Solar Photovoltaic44 MW44 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 44 MW solar plant and a 44 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates