Camino Solar Hybrid
Solar power plant · Kern County, California
Nameplate capacity
44 MW
Rank in California
#493
of 1,897 plants
In service since
2025
April 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Avangrid Power LLC
- County
- Kern County
- Generating units
- 1
- Share of state capacity
- 0.04%
- Rank among solar plants in California
- #135 of 937
- EIA plant code
- 63508
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| CSPV1 | Solar Photovoltaic | 44 MW | 44 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Drews Generating Facility | Natural gas | 45 MW |
| CD4 | Other | 44 MW |
| Chicago Park | Hydro | 44 MW |
| San Gorgonio Westwinds II LLC | Wind | 43 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 44 MW solar plant and a 44 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates