Home / Power plants / California / Grossmont College

Grossmont College

Solar power plant · San Diego County, California

Nameplate capacity
2.6 MW
Rank in California
#1296
of 1,897 plants
In service since
2023
March 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Forefront Power, LLC
County
San Diego County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#518 of 937
EIA plant code
67509

Generating units

Individual generating units at Grossmont College
UnitTechnologyNameplateSummerOnlineStatus
19064Solar Photovoltaic2.6 MW2.6 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Danell Bros IncSolar2.6 MW
ESCA-LL-COLTON, LLCSolar2.6 MW
IGS SBD1Solar2.6 MW
Lower Tule RiverHydro2.6 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.6 MW solar plant and a 2.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates