Home / Power plants / California / San Jacinto Grid, LLC

San Jacinto Grid, LLC

Battery storage power plant · Riverside County, California

Nameplate capacity
65 MW
Rank in California
#365
of 1,897 plants
In service since
2025
October 2025

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
San Jacinto Grid, LLC
County
Riverside County
Generating units
1
Share of state capacity
0.06%
Rank among battery storage plants in California
#53 of 142
EIA plant code
65657

Generating units

Individual generating units at San Jacinto Grid, LLC
UnitTechnologyNameplateSummerOnlineStatus
HESJGBatteries65 MW65 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

San Francisquito 1Hydro66 MW
RE Gaskell West 2 LLCSolar65 MW
GianeraNatural gas65 MW
Point WindWind65 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 65 MW solar plant and a 65 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates