Home / Power plants / California / Dos Palos Cooperative Gin

Dos Palos Cooperative Gin

Solar power plant · Merced County, California

Nameplate capacity
1.0 MW
Rank in California
#1791
of 1,897 plants
In service since
2022
December 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
A2B Development LLC dba Mars Energy Development
County
Merced County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#863 of 937
EIA plant code
68808

Generating units

Individual generating units at Dos Palos Cooperative Gin
UnitTechnologyNameplateSummerOnlineStatus
P1001Solar Photovoltaic1.0 MW0.9 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Division 2Solar1.0 MW
Division 3Solar1.0 MW
E&B ResourcesSolar1.0 MW
EAFB - North BaseSolar1.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates