CA-DGS-California Correctional Inst
Solar power plant · Kern County, California
Nameplate capacity
4.0 MW
Rank in California
#1098
of 1,897 plants
In service since
2024
April 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Forefront Power, LLC
- County
- Kern County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #391 of 937
- EIA plant code
- 65105
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 15111 | Solar Photovoltaic | 4.0 MW | 4.0 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Arrache 8083 | Solar | 4.0 MW |
| Blackjack Solar | Solar | 4.0 MW |
| Chaffey College Rancho Cucamonga Campus | Solar | 4.0 MW |
| Chuckawalla Solar | Solar | 4.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.0 MW solar plant and a 4.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates