Home / Power plants / California / Division 2

Division 2

Solar power plant · Los Angeles County, California

Nameplate capacity
1.0 MW
Rank in California
#1789
of 1,897 plants
In service since
2014
June 2014

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Tesla Inc.
County
Los Angeles County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#861 of 937
EIA plant code
59095

Generating units

Individual generating units at Division 2
UnitTechnologyNameplateSummerOnlineStatus
GEN 1Solar Photovoltaic1.0 MW1.0 MW2014Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

DirecTV - Los AngelesNatural gas1.0 MW
Disney ProspectNatural gas1.0 MW
Division 3Solar1.0 MW
Dos Palos Cooperative GinSolar1.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates