Home / Power plants / California / Baldy Mesa 2_Silver Peak Hybrid

Baldy Mesa 2_Silver Peak Hybrid

Solar power plant · San Bernardino County, California

Nameplate capacity
75 MW
Rank in California
#337
of 1,897 plants
In service since
2024
December 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
AES Clean Energy
County
San Bernardino County
Generating units
2
Share of state capacity
0.07%
Rank among solar plants in California
#107 of 937
EIA plant code
66885

Generating units

Individual generating units at Baldy Mesa 2_Silver Peak Hybrid
UnitTechnologyNameplateSummerOnlineStatus
SPKPVSolar Photovoltaic50 MW50 MW2024Operating
SPKBSBatteries25 MW25 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

McClellan (CA)Natural gas77 MW
Mojave 16/17/18 BESSBattery storage77 MW
Big Creek 8Hydro75 MW
Desert Peak Energy Storage IIBattery storage75 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 75 MW solar plant and a 75 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates