Northern Orchard Solar PV, LLC

Solar power plant · Kern County, California

Nameplate capacity
242 MW
Rank in California
#112
of 1,928 plants
In service since
2025
July 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Kern County
Generating units
2
Share of state capacity
0.22%
Rank among solar plants in California
#45 of 968
EIA plant code
67039

Generating units

Individual generating units at Northern Orchard Solar PV, LLC
UnitTechnologyNameplateSummerOnlineStatus
NO1Solar Photovoltaic150 MW150 MW2025Operating
NOBATBatteries92 MW92 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 242 MW solar plant and a 242 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates