Northern Orchard Solar PV, LLC

Solar power plant · Kern County, California

Nameplate capacity
242 MW
Rank in California
#110
of 1,897 plants
In service since
2025
July 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Kern County
Generating units
2
Share of state capacity
0.22%
Rank among solar plants in California
#43 of 937
EIA plant code
67039

Generating units

Individual generating units at Northern Orchard Solar PV, LLC
UnitTechnologyNameplateSummerOnlineStatus
NO1Solar Photovoltaic150 MW150 MW2025Operating
NOBATBatteries92 MW92 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Crockett Cogen ProjectNatural gas247 MW
Blythe Solar II, LLCBattery storage246 MW
Arlington Energy Center IIISolar241 MW
Scarlet Solar (CA)Solar240 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 242 MW solar plant and a 242 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates