2127 Harris Solar Project
Solar power plant · Butte County, California
Nameplate capacity
1.3 MW
Rank in California
#1634
of 1,897 plants
In service since
2014
April 2014
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Solarenewal LLC
- County
- Butte County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #758 of 937
- EIA plant code
- 58919
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 2127 | Solar Photovoltaic | 1.3 MW | 1.3 MW | 2014 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Vallecitos Water District | Solar | 1.4 MW |
| Vulcan San Emidio Solar | Solar | 1.4 MW |
| 9150 Hermosa Solar GM | Solar | 1.3 MW |
| AT&T Anaheim | Natural gas | 1.3 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.3 MW solar plant and a 1.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates