Aratina Solar Center 1A
Solar power plant · San Bernardino County, California
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- 64NB 8me LLC
- County
- San Bernardino County
- Generating units
- 2
- Share of state capacity
- 0.18%
- Rank among solar plants in California
- #57 of 968
- EIA plant code
- 68661
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 64NB8 | Solar Photovoltaic | 120 MW | 120 MW | 2026 | Operating |
| 64BES | Batteries | 75 MW | 75 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Riverside Energy Resource Center | Natural gas | 196 MW |
| Sandrini Solar 100 | Solar | 195 MW |
| Procter & Gamble Power Plant | Natural gas | 193 MW |
| Mammoth Pool | Hydro | 190 MW |
About this data
From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 195 MW solar plant and a 195 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates