Home / Power plants / California / Centinela Solar Energy

Centinela Solar Energy

Solar power plant · Imperial County, California

Nameplate capacity
175 MW
Rank in California
#150
of 1,897 plants
In service since
2013
July 2013

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Centinela Solar Energy LLC
County
Imperial County
Generating units
6
Share of state capacity
0.16%
Rank among solar plants in California
#57 of 937
EIA plant code
58430

Generating units

Individual generating units at Centinela Solar Energy
UnitTechnologyNameplateSummerOnlineStatus
CSE1Solar Photovoltaic34 MW33 MW2013Operating
CSE3Solar Photovoltaic34 MW33 MW2013Operating
CSE4Solar Photovoltaic34 MW33 MW2013Operating
CSE2Solar Photovoltaic27 MW26 MW2013Operating
CSE6Solar Photovoltaic27 MW26 MW2014Operating
CSE5Solar Photovoltaic19 MW19 MW2014Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Calistoga Power PlantOther176 MW
RE Mustang LLCSolar175 MW
Big Creek 3Hydro175 MW
Campbell Power PlantNatural gas174 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 175 MW solar plant and a 175 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates