Nameplate capacity
2.7 MW
Rank in California
#1284
of 1,897 plants
In service since
1982
April 1982
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Merced Irrigation District
- County
- Merced County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among hydro plants in California
- #204 of 244
- EIA plant code
- 428
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 2.7 MW | 2.7 MW | 1982 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Dept of General Services -FTB | Solar | 2.7 MW |
| Niagara Bottling Ontario PHI | Solar | 2.7 MW |
| Rio Vista Solar | Solar | 2.7 MW |
| San Antonio Regional Hospital | Natural gas | 2.7 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.7 MW solar plant and a 2.7 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates