Home / Power plants / California / Intel Folsom

Intel Folsom

Solar power plant · Sacramento County, California

Nameplate capacity
1.0 MW
Rank in California
#1811
of 1,897 plants
In service since
2010
July 2010

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Tesla Inc.
County
Sacramento County
Generating units
2
Share of state capacity
0.00%
Rank among solar plants in California
#877 of 937
EIA plant code
58086

Generating units

Individual generating units at Intel Folsom
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic0.5 MW0.5 MW2010Operating
2Solar Photovoltaic0.5 MW0.5 MW2010Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

HickmanHydro1.0 MW
Hollister Wastewater FacilitySolar1.0 MW
Intel Folsom Phase 2Solar1.0 MW
Kaiser DowneyNatural gas1.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates