Lincoln WWTF Hybrid
Solar power plant · Placer County, California
Nameplate capacity
4.0 MW
Rank in California
#1108
of 1,897 plants
In service since
2021
August 2021
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Lincoln Solar Star, LLC
- County
- Placer County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #399 of 937
- EIA plant code
- 65382
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PV | Solar Photovoltaic | 3.0 MW | 2.8 MW | 2021 | Operating |
| ESS | Batteries | 1.0 MW | 1.0 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| IOS II-LAX9 | Solar | 4.0 MW |
| Ironwood Solar LLC | Solar | 4.0 MW |
| Lindsay Solar | Solar | 4.0 MW |
| Martinez Sulfuric Acid Regeneration Plt | Other | 4.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.0 MW solar plant and a 4.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.