Home / Power plants / California / CED Ducor 1

CED Ducor 1

Solar power plant · Tulare County, California

Nameplate capacity
20 MW
Rank in California
#641
of 1,897 plants
In service since
2016
December 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Tulare County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in California
#175 of 937
EIA plant code
60078

Generating units

Individual generating units at CED Ducor 1
UnitTechnologyNameplateSummerOnlineStatus
DU1CASolar Photovoltaic20 MW20 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Beacon BESS 1Battery storage20 MW
Blackwell Solar ParkSolar20 MW
CED Ducor 2Solar20 MW
CED Ducor 4Solar20 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 20 MW solar plant and a 20 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates