All 200 operable plants · EIA inventory, May 2026.
Capacity by fuel
| Fuel | Capacity | Share | Plants |
|---|---|---|---|
| Natural gas | 17,747 MW | 41.5% | 33 |
| Solar | 8,216 MW | 19.2% | 105 |
| Battery storage | 5,287 MW | 12.4% | 35 |
| Nuclear | 4,210 MW | 9.8% | 1 |
| Hydro | 2,914 MW | 6.8% | 11 |
| Coal | 2,601 MW | 6.1% | 2 |
| Wind | 1,705 MW | 4.0% | 9 |
| Other | 60 MW | 0.1% | 4 |
Nameplate capacity — what the fleet could produce running flat out — not what it actually generated. A plant is filed under the fuel carrying most of its capacity. See what Arizona actually generated →
Largest plants in Arizona
| # | Plant | Fuel | Capacity | Online |
|---|---|---|---|---|
| 1 | Palo VerdeMaricopa County | Nuclear | 4,210 MW | 1986 |
| 2 | SpringervilleApache County | Coal | 1,779 MW | 1985 |
| 3 | SantanMaricopa County | Natural gas | 1,326 MW | 1974 |
| 4 | Glen Canyon DamCoconino County | Hydro | 1,312 MW | 1964 |
| 5 | Harquahala Generating ProjectMaricopa County | Natural gas | 1,277 MW | 2004 |
| 6 | West PhoenixMaricopa County | Natural gas | 1,207 MW | 1972 |
| 7 | Red HawkMaricopa County | Natural gas | 1,127 MW | 2002 |
| 8 | Hoover Dam (AZ)Mohave County | Hydro | 1,039 MW | 1936 |
| 9 | CoronadoApache County | Coal | 822 MW | 1979 |
| 10 | OcotilloMaricopa County | Natural gas | 806 MW | 1972 |
Arizona's generating fleet in context
Arizona's generating fleet holds 42.7 gigawatts of nameplate capacity, ranking eighth among the fifty states and territories. What the equipment could produce running flat out is not the same as what it actually generates: a megawatt of solar and a megawatt of nuclear appear identical in these figures but produce very different amounts of electricity over a year.
Natural gas leads the fuel mix at 41.5% of capacity across 33 plants, followed by solar at 19.2% across 105 plants and battery storage at 12.4% across 35 plants. Nuclear accounts for 9.8%, hydro for 6.8%, coal for 6.1%, wind for 4%, and other sources for 0.1%. The largest plants are Palo Verde, a nuclear facility with 4,210 megawatts, Springerville coal at 1,779 megawatts, Santan natural gas at 1,326 megawatts, Glen Canyon Dam hydro at 1,312 megawatts, and Harquahala Generating Project natural gas at 1,277 megawatts.
The fleet spans from Horse Mesa, first online in April 1927, through the newest addition, Justice Energy Storage, which came online in May 2026. Of 200 plants tracked in the state, 197 were in service as of May 2026.
Written from the EIA figures on this page, covering data through May 2026.
Every plant in Arizona, by fuel
Natural gas33 plants · 17,747 MW
All US natural gas plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Santan | Maricopa | 1,326 MW | 9 | 1974 |
| Harquahala Generating Project | Maricopa | 1,277 MW | 6 | 2004 |
| West Phoenix | Maricopa | 1,207 MW | 10 | 1972 |
| Red Hawk | Maricopa | 1,127 MW | 6 | 2002 |
| Ocotillo | Maricopa | 806 MW | 7 | 1972 |
| Apache Station | Cochise | 782 MW | 9 | 1963 |
| Desert Basin | Pinal | 745 MW | 5 | 2001 |
| Agua Fria | Maricopa | 738 MW | 10 | 1957 |
| Coolidge Generation Station | Pinal | 726 MW | 12 | 2011 |
| Arlington Valley Energy Facility | Maricopa | 713 MW | 3 | 2002 |
| South Point Energy Center | Mohave | 708 MW | 3 | 2001 |
| Sundance | Pinal | 695 MW | 12 | 2002 |
| Mesquite Generating Station Block 1 | Maricopa | 692 MW | 3 | 2003 |
| Mesquite Generating Station Block 2 | Maricopa | 692 MW | 3 | 2003 |
| Griffith Energy LLC | Mohave | 655 MW | 3 | 2002 |
| Gila River Power Block 1 | Maricopa | 619 MW | 3 | 2003 |
| Gila River Power Block 2 | Maricopa | 619 MW | 3 | 2003 |
| Gila River Power Block 3 | Maricopa | 619 MW | 3 | 2003 |
| Gila River Power Block 4 | Maricopa | 619 MW | 3 | 2003 |
| Kyrene | Maricopa | 574 MW | 7 | 1952 |
| H Wilson Sundt Generating Station | Pima | 529 MW | 14 | 1962 |
| Yucca | Yuma | 422 MW | 8 | 1959 |
| Saguaro | Pinal | 185 MW | 3 | 1972 |
| Copper Crossing Energy and Research Cent | Pinal | 154 MW | 5 | 2024 |
| Black Mountain Generating Station | Mohave | 121 MW | 2 | 2008 |
| Valencia | Santa Cruz | 108 MW | 4 | 1989 |
| North Loop | Pima | 108 MW | 4 | 1972 |
| Demoss Petrie | Pima | 85 MW | 1 | 2001 |
| Yuma Cogeneration Associates | Yuma | 63 MW | 2 | 1994 |
| Arizona State University CHP | Maricopa | 17 MW | 2 | 2006 |
| Cogeneration 1 | Pima | 9.0 MW | 1 | 2002 |
| Cogeneration 2 | Pima | 5.5 MW | 1 | 2002 |
| University of Arizona - Biosphere 2 | Pinal | 3.1 MW | 2 | 1990 |
Solar105 plants · 8,216 MW
All US solar plants →Battery storage35 plants · 5,287 MW
All US battery storage plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Harquahala 2 | Maricopa | 600 MW | 2 | 2025 |
| Roadrunner Solar and BESS | Cochise | 470 MW | 2 | 2025 |
| Serrano | Pima | 384 MW | 2 | 2025 |
| Atlas VII | La Paz | 300 MW | 2 | 2025 |
| Papago Energy Storage | Maricopa | 300 MW | 1 | 2025 |
| Beehive Energy Storage | Maricopa | 250 MW | 1 | 2026 |
| Pediment BESS I | Maricopa | 250 MW | 1 | 2026 |
| Sierra Estrella Energy Storage | Maricopa | 250 MW | 1 | 2024 |
| Flatland Storage | Pinal | 200 MW | 1 | 2025 |
| Roadrunner Reserve Phase 1 | Pima | 200 MW | 1 | 2025 |
| Westwing | Maricopa | 200 MW | 2 | 2024 |
| Wilmot Energy Center II | Pima | 200 MW | 2 | 2026 |
| McFarland C | Yuma | 185 MW | 1 | 2025 |
| Scatter Wash 1 | Maricopa | 170 MW | 1 | 2025 |
| Atlas IX | La Paz | 150 MW | 1 | 2025 |
| Justice Energy Storage | Maricopa | 150 MW | 1 | 2026 |
| Yuma Solar + Storage | Yuma | 140 MW | 2 | 2025 |
| Sierra Pinta BESS | Yuma | 113 MW | 1 | 2025 |
| Saint Energy Storage II LLC | Pinal | 100 MW | 1 | 2023 |
| Superstition Energy Storage | Maricopa | 90 MW | 1 | 2024 |
| Scatter Wash 2 | Maricopa | 85 MW | 1 | 2025 |
| Pluto Energy Storage | Maricopa | 75 MW | 1 | 2025 |
| Foothills Solar Plant Hybrid | Yuma | 73 MW | 3 | 2013 |
| El Sol BESS | Maricopa | 50 MW | 1 | 2023 |
| Kingman Energy Storage | Mohave | 50 MW | 1 | 2025 |
| SR McNeal | Cochise | 40 MW | 2 | 2023 |
| Chino Valley Solar | Yavapai | 38 MW | 2 | 2012 |
| Cotton Center Solar Hybrid | Maricopa | 34 MW | 2 | 2011 |
| Paloma Solar Hybrid | Maricopa | 34 MW | 2 | 2011 |
| Hyder II Hybrid | Yuma | 28 MW | 2 | 2013 |
| Mohave Electric Cooperative at Joy Lane | Mohave | 26 MW | 2 | 2016 |
| Desert Star Hybrid | Maricopa | 20 MW | 2 | 2015 |
| Iron Horse Battery Storage Hybrid | Pima | 12 MW | 2 | 2017 |
| AES ES GILBERT | Maricopa | 10 MW | 1 | 2019 |
| Pima Energy Storage System | Pima | 10 MW | 1 | 2017 |
Nuclear1 plant · 4,210 MW
All US nuclear plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Palo Verde | Maricopa | 4,210 MW | 3 | 1986 |
Hydro11 plants · 2,914 MW
All US hydro plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Glen Canyon Dam | Coconino | 1,312 MW | 8 | 1964 |
| Hoover Dam (AZ) | Mohave | 1,039 MW | 10 | 1936 |
| Davis Dam | Mohave | 255 MW | 5 | 1951 |
| Horse Mesa | Maricopa | 131 MW | 4 | 1927 |
| Mormon Flat | Maricopa | 64 MW | 2 | 1971 |
| Waddell | Maricopa | 40 MW | 4 | 1993 |
| Roosevelt | Maricopa | 36 MW | 1 | 1973 |
| Headgate Rock | La Paz | 20 MW | 3 | 1993 |
| Stewart Mountain | Maricopa | 13 MW | 1 | 1930 |
| Crosscut | Maricopa | 3.0 MW | 1 | 1939 |
| South Consolidated | Maricopa | 1.4 MW | 1 | 1981 |
Coal2 plants · 2,601 MW
All US coal plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Springerville | Apache | 1,779 MW | 7 | 1985 |
| Coronado | Apache | 822 MW | 2 | 1979 |
Wind9 plants · 1,705 MW
All US wind plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| West Camp Wind Farm | Navajo | 500 MW | 1 | 2026 |
| Mohave County Wind Farm | Mohave | 350 MW | 1 | 2020 |
| Chevelon Butte Wind Farm | Coconino | 238 MW | 1 | 2023 |
| Chevelon Butte Phase 2 | Coconino | 216 MW | 1 | 2024 |
| Babbitt Ranch Energy Center | Coconino | 163 MW | 1 | 2024 |
| Perrin Ranch Wind LLC | Coconino | 99 MW | 1 | 2012 |
| Poseidon Wind, LLC | Navajo | 65 MW | 1 | 2010 |
| Dry Lake Wind LLC | Navajo | 63 MW | 1 | 2009 |
| Kingman 1 | Mohave | 11 MW | 2 | 2011 |
Other4 plants · 60 MW
All US other plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Novo BioPower Plant | Navajo | 27 MW | 1 | 2008 |
| Douglas | Cochise | 26 MW | 1 | 1972 |
| Northwest Regional | Maricopa | 3.2 MW | 2 | 2012 |
| Western Renewable Energy | Apache | 3.0 MW | 1 | 2004 |
Sorted by nameplate capacity within each fuel. “Online” is the year the plant’s earliest surviving unit entered service.