Home / Power plants / California / Da Silva Dairy

Da Silva Dairy

Solar power plant · San Joaquin County, California

Nameplate capacity
1.0 MW
Rank in California
#1783
of 1,897 plants
In service since
2022
November 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
A2B Development LLC dba Mars Energy Development
County
San Joaquin County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#857 of 937
EIA plant code
68840

Generating units

Individual generating units at Da Silva Dairy
UnitTechnologyNameplateSummerOnlineStatus
P1002Solar Photovoltaic1.0 MW0.9 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Crown Cooling FacilitySolar1.0 MW
DATSBattery storage1.0 MW
Delano Land 1Solar1.0 MW
Delta Electronics FremontSolar1.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates