Home / Power plants / California / Allied Potato

Allied Potato

Solar power plant · Kern County, California

Nameplate capacity
1.2 MW
Rank in California
#1668
of 1,897 plants
In service since
2025
May 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Renewable Solar, Inc
County
Kern County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#785 of 937
EIA plant code
68150

Generating units

Individual generating units at Allied Potato
UnitTechnologyNameplateSummerOnlineStatus
19073Solar Photovoltaic1.2 MW1.2 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

2081 Terzian Solar ProjectSolar1.2 MW
ASTISolar1.2 MW
Alticor Inc - Solar ProjectSolar1.2 MW
BakerBattery storage1.2 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.2 MW solar plant and a 1.2 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates