Power Plants in Texas
All 1,095 operable plants · EIA inventory, August 2026.
Capacity by fuel
| Fuel | Capacity | Share | Plants |
|---|---|---|---|
| Natural gas | 83,458 MW | 40.7% | 312 |
| Wind | 44,867 MW | 21.9% | 230 |
| Solar | 35,889 MW | 17.5% | 242 |
| Coal | 17,853 MW | 8.7% | 12 |
| Battery storage | 15,517 MW | 7.6% | 226 |
| Nuclear | 5,139 MW | 2.5% | 2 |
| Other | 1,448 MW | 0.7% | 48 |
| Hydro | 735 MW | 0.4% | 23 |
Nameplate capacity — what the fleet could produce running flat out — not what it actually generated. A plant is filed under the fuel carrying most of its capacity. See what Texas actually generated →
Largest plants in Texas
| # | Plant | Fuel | Capacity | Online |
|---|---|---|---|---|
| 1 | W A ParishFort Bend County | Coal | 4,008 MW | 1958 |
| 2 | South Texas ProjectMatagorda County | Nuclear | 2,709 MW | 1988 |
| 3 | Comanche PeakSomervell County | Nuclear | 2,430 MW | 1990 |
| 4 | Martin LakeRusk County | Coal | 2,380 MW | 1977 |
| 5 | Forney Energy CenterKaufman County | Natural gas | 1,894 MW | 2003 |
| 6 | LimestoneLimestone County | Coal | 1,850 MW | 1985 |
| 7 | SabineOrange County | Natural gas | 1,812 MW | 1962 |
| 8 | Oak Grove (TX)Robertson County | Coal | 1,795 MW | 2010 |
| 9 | Midlothian Energy FacilityEllis County | Natural gas | 1,734 MW | 2000 |
| 10 | Fayette Power ProjectFayette County | Coal | 1,690 MW | 1979 |
Texas's generating fleet in context
Texas holds 204.9 GW of generating capacity, ranking first of the 50 states and DC. This capacity is measured as nameplate capacity — what the equipment could produce running flat out, not what it actually generates, which varies widely by fuel type and season.
Natural gas and wind together carry most of the fleet. Natural gas accounts for 40.7% of capacity across 312 plants, while wind provides 21.9% across 230 plants. Solar adds 17.5% across 242 plants, coal represents 8.7% across 12 plants, and battery storage holds 7.6% across 226 plants. Nuclear, hydro, and other sources make up the remainder. The largest single plant is W A Parish, a coal facility with 4,008 MW first online in 1958. South Texas Project, a nuclear station, ranks second at 2,709 MW, followed by Comanche Peak at 2,430 MW also nuclear. Martin Lake, a coal plant with 2,380 MW, and Forney Energy Center, a natural gas facility with 1,894 MW first online in 2003, round out the five largest.
The fleet spans nearly a century of technology. The oldest plant listed, Dunlap TP 1, came online in January 1927. The newest, Hubbard Wind II, entered service in August 2026. The 1,095 plants tracked include everything down to sub-megawatt backup generators, so the count does not reflect the size of the fleet — capacity is the meaningful measure of that.
Written from the EIA figures on this page, covering data through August 2026.
Every plant in Texas, by fuel
Natural gas312 plants · 83,458 MW
All US natural gas plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Forney Energy Center | Kaufman | 1,894 MW | 8 | 2003 |
| Sabine | Orange | 1,812 MW | 4 | 1962 |
| Midlothian Energy Facility | Ellis | 1,734 MW | 6 | 2000 |
| Temple Power Station | Bell | 1,606 MW | 6 | 2014 |
| Cedar Bayou | Chambers | 1,530 MW | 2 | 1970 |
| Cottonwood Energy Company LP | Newton | 1,434 MW | 8 | 2003 |
| Handley | Tarrant | 1,315 MW | 3 | 1963 |
| Jack County | Wise | 1,280 MW | 6 | 2006 |
| Wolf Hollow II | Hood | 1,231 MW | 3 | 2017 |
| Colorado Bend II | Wharton | 1,230 MW | 3 | 2017 |
| T H Wharton | Harris | 1,190 MW | 17 | 1967 |
| Deer Park Energy Center | Harris | 1,176 MW | 6 | 2003 |
| Odessa-Ector Power Plant | Ector | 1,153 MW | 6 | 2001 |
| V H Braunig | Bexar | 1,138 MW | 7 | 1966 |
| Lamar Power Project | Lamar | 1,113 MW | 6 | 2000 |
| Newman | El Paso | 1,110 MW | 10 | 1960 |
| Rio Nogales Power Project | Guadalupe | 1,108 MW | 4 | 2002 |
| Guadalupe Generating Station | Guadalupe | 1,088 MW | 6 | 2000 |
| Barney M Davis | Nueces | 1,082 MW | 4 | 1974 |
| Harrington | Potter | 1,080 MW | 3 | 1976 |
| Freestone Energy Center | Freestone | 1,036 MW | 6 | 2002 |
| Montgomery County | Montgomery | 1,000 MW | 3 | 2021 |
| Hays Energy Project | Hays | 989 MW | 4 | 2002 |
| Tenaska Frontier Generation Station | Grimes | 940 MW | 4 | 2000 |
| Tenaska Gateway Generating Station | Rusk | 940 MW | 4 | 2001 |
| Formosa Utility Venture Ltd | Calhoun | 933 MW | 13 | 1987 |
| Baytown Energy Center | Chambers | 933 MW | 4 | 2002 |
| Lake Hubbard | Dallas | 928 MW | 2 | 1970 |
| Channel Energy Center LLC | Harris | 924 MW | 4 | 2001 |
| Channelview Cogeneration Plant | Harris | 918 MW | 5 | 2001 |
| O W Sommers | Bexar | 892 MW | 2 | 1972 |
| Wilkes | Marion | 882 MW | 3 | 1964 |
| Green Power 2 | Galveston | 861 MW | 5 | 2003 |
| Jones | Lubbock | 860 MW | 4 | 1971 |
| Mountain Creek | Dallas | 852 MW | 3 | 1956 |
| Wise County Power LLC | Wise | 822 MW | 3 | 2004 |
| Pasadena Cogeneration | Harris | 815 MW | 5 | 1998 |
| Thad Hill Energy Center | Bosque | 807 MW | 5 | 2000 |
| Rayburn Energy Station LLC | Grayson | 803 MW | 3 | 2014 |
| Magic Valley Generating Station | Hidalgo | 801 MW | 3 | 2002 |
| Wolf Hollow I LP | Hood | 788 MW | 3 | 2003 |
| Nueces Bay | Nueces | 730 MW | 3 | 1972 |
| Stryker Creek | Cherokee | 713 MW | 7 | 1958 |
| Sand Hill | Travis | 696 MW | 8 | 2001 |
| ExxonMobil Beaumont Refinery | Jefferson | 678 MW | 10 | 1966 |
| Jack Fusco Energy Center | Fort Bend | 676 MW | 3 | 2003 |
| Colorado Bend Energy Center | Wharton | 654 MW | 8 | 2002 |
| Odyssey Energy Altura Cogen, LLC | Harris | 644 MW | 7 | 1985 |
| Graham | Young | 635 MW | 2 | 1960 |
| DeCordova Steam Electric Station | Hood | 627 MW | 5 | 1990 |
| Sim Gideon | Bastrop | 623 MW | 3 | 1965 |
| Bastrop Energy Center | Bastrop | 619 MW | 3 | 2002 |
| Lost Pines 1 Power Project | Bastrop | 609 MW | 3 | 2001 |
| Topaz Generating | Galveston | 605 MW | 10 | 2021 |
| R W Miller | Palo Pinto | 604 MW | 5 | 1968 |
| Freeport Energy | Brazoria | 603 MW | 6 | 1982 |
| Elk Station | Hale | 599 MW | 3 | 2015 |
| Sabine River Operations | Orange | 595 MW | 4 | 1987 |
| Corpus Christi Energy Center | Nueces | 593 MW | 3 | 2002 |
| Arthur Von Rosenberg | Bexar | 575 MW | 3 | 2000 |
| Thomas C Ferguson | Llano | 575 MW | 3 | 2014 |
| Sweeny Cogen Facility | Brazoria | 572 MW | 4 | 1997 |
| Harrison County Power Project | Harrison | 570 MW | 3 | 2003 |
| Hidalgo Energy Center | Hidalgo | 551 MW | 3 | 2000 |
| Quail Run Energy Center | Ector | 550 MW | 6 | 2002 |
| Lewis Creek | Montgomery | 543 MW | 2 | 1970 |
| Cedar Bayou 4 | Chambers | 536 MW | 3 | 2009 |
| Frontera Energy Center | Hidalgo | 529 MW | 3 | 1999 |
| Montana Power Station | El Paso | 527 MW | 4 | 2015 |
| Mustang Station | Yoakum | 521 MW | 3 | 1999 |
| Ingleside Cogeneration | San Patricio | 517 MW | 3 | 1999 |
| Oyster Creek Unit VIII | Brazoria | 498 MW | 4 | 1994 |
| Braes Bayou Plant | Fort Bend | 484 MW | 8 | 2022 |
| Brotman Power Station | Brazoria | 484 MW | 8 | 2023 |
| HO Clarke Generating | Harris | 484 MW | 8 | 2021 |
| Mark One Power Station | Brazoria | 484 MW | 8 | 2022 |
| Remy Jade Power Station | Harris | 484 MW | 8 | 2024 |
| Nichols | Potter | 475 MW | 3 | 1960 |
| Mustang Station Unit 4 | Yoakum | 472 MW | 3 | 2006 |
| Gregory Power Plant | San Patricio | 470 MW | 3 | 2000 |
| Eastman Cogeneration Facility | Harrison | 468 MW | 3 | 2001 |
| Texas City Power Plant | Galveston | 450 MW | 4 | 1987 |
| Permian Basin | Ward | 447 MW | 5 | 1988 |
| Pin Oak Creek Energy Center, LLC | Freestone | 444 MW | 2 | 2026 |
| Greens Bayou | Harris | 432 MW | 6 | 1976 |
| Ray Olinger | Collin | 428 MW | 4 | 1967 |
| Bacliff | Galveston | 427 MW | 6 | 2018 |
| Ennis Power Company LLC | Ellis | 418 MW | 2 | 2002 |
| ExxonMobil Baytown Turbine | Harris | 382 MW | 5 | 1989 |
| Houston Chemical Complex Battleground | Harris | 381 MW | 4 | 1982 |
| NRG THW GT Electric Generating Station | Harris | 377 MW | 2 | 2026 |
| Victoria | Victoria | 377 MW | 2 | 1963 |
| Timmerman Power Plant | Caldwell | 368 MW | 20 | 2025 |
| Ector County Energy Center | Ector | 359 MW | 2 | 2015 |
| Knox Lee | Gregg | 351 MW | 1 | 1974 |
| Bayou Cogen Plant | Harris | 318 MW | 4 | 2014 |
| CFB Power Plant | Calhoun | 310 MW | 2 | 2012 |
| Johnson County | Johnson | 283 MW | 2 | 1996 |
| Motiva Enterprises Port Arthur Refinery | Jefferson | 277 MW | 9 | 1957 |
| Shell Deer Park | Harris | 274 MW | 4 | 1979 |
| Paris Energy Center | Lamar | 266 MW | 3 | 1989 |
| Friendswood Energy | Harris | 265 MW | 4 | 2018 |
| Laredo | Webb | 264 MW | 2 | 2008 |
| Freeport Energy Center | Brazoria | 260 MW | 2 | 2007 |
| Black Hawk Station | Hutchinson | 244 MW | 2 | 1999 |
| Trinidad (TX) | Henderson | 243 MW | 3 | 1965 |
| Winchester Power Park | Fayette | 242 MW | 4 | 2010 |
| Exelon LaPorte Generating Station | Harris | 236 MW | 4 | 2001 |
| Leon Creek | Bexar | 230 MW | 4 | 2004 |
| Denton Energy Center | Denton | 226 MW | 12 | 2018 |
| Red Gate Power Plant | Hidalgo | 224 MW | 12 | 2016 |
| ExxonMobil Baytown Refinery | Harris | 209 MW | 7 | 1952 |
| Decker Creek | Travis | 206 MW | 4 | 1988 |
| Dansby | Brazos | 203 MW | 3 | 1978 |
| Pearsall | Frio | 202 MW | 24 | 2010 |
| Sam Rayburn | Victoria | 193 MW | 6 | 1991 |
| Power Station 4 | Galveston | 191 MW | 3 | 1986 |
| Plant X | Lamb | 190 MW | 1 | 1964 |
| San Jacinto Steam Electric Station | Harris | 176 MW | 2 | 1995 |
| Hardin County Peaking Facility | Hardin | 173 MW | 2 | 2001 |
| San Jacinto County Peaking Facility | San Jacinto | 170 MW | 2 | 2001 |
| C R Wing Cogen Plant | Howard | 170 MW | 2 | 1987 |
| Air Products Port Arthur | Jefferson | 169 MW | 4 | 2000 |
| Union Carbide Seadrift Cogen | Calhoun | 168 MW | 8 | 1964 |
| Antelope Station | Hale | 167 MW | 18 | 2011 |
| EG178 Facility | Scurry | 154 MW | 3 | 2005 |
| Hal C Weaver Power Plant | Travis | 153 MW | 6 | 1951 |
| Silas Ray | Cameron | 143 MW | 8 | 1959 |
| Power Island | Brazoria | 141 MW | 3 | 1985 |
| Spencer | Denton | 127 MW | 2 | 1966 |
| Calhoun Port Comfort | Calhoun | 121 MW | 2 | 2017 |
| Chamon | Harris | 121 MW | 2 | 2017 |
| Victoria Texas Plant | Victoria | 102 MW | 1 | 1987 |
| Texas Gulf Sulphur | Wharton | 102 MW | 1 | 1984 |
| SJRR (LIG) | Harris | 100 MW | 2 | 2022 |
| Tres City Power LLC | Victoria | 100 MW | 2 | 2020 |
| Tres Port Power, LLC | Victoria | 100 MW | 2 | 2019 |
| Victoria Port II | Victoria | 100 MW | 2 | 2022 |
| TECO CHP-1 | Harris | 98 MW | 2 | 2010 |
| BASF Freeport Works | Brazoria | 93 MW | 2 | 1999 |
| Freeport LP Pretreatment Facility | Brazoria | 87 MW | 1 | 2019 |
| Copper | El Paso | 87 MW | 1 | 1980 |
| NAFTA Region Olefins Complex Cogen Fac | Jefferson | 83 MW | 2 | 2001 |
| Petra Nova Carbon Capture Cogen | Fort Bend | 82 MW | 1 | 2013 |
| Signal Hill Generating LLC | Wichita | 80 MW | 4 | 1987 |
| Corpus Refinery | Nueces | 75 MW | 2 | 1988 |
| JCO Oxides Olefins Plant | Jefferson | 74 MW | 2 | 1992 |
| Ascend Performance Materials Texas Inc. | Brazoria | 52 MW | 2 | 1993 |
| Sky Global Power One | Colorado | 51 MW | 6 | 2016 |
| Central Utility Plant - Texas A&M | Brazos | 45 MW | 2 | 2011 |
| Ticona Polymers Inc | Nueces | 44 MW | 1 | 1989 |
| Corpus Christi | Nueces | 41 MW | 1 | 1989 |
| Port Arthur Texas Refinery | Jefferson | 38 MW | 1 | 1988 |
| Texas Petrochemicals | Harris | 35 MW | 1 | 1972 |
| Chickadee G-3 | Jefferson | 35 MW | 5 | 1987 |
| Borger Plant | Hutchinson | 30 MW | 1 | 1985 |
| NEWPP | Harris | 30 MW | 1 | 2024 |
| Wasson CO2 Removal Plant | Yoakum | 23 MW | 1 | 1988 |
| Bryan (TX) | Brazos | 22 MW | 1 | 1975 |
| Enterprise Products Operating | Chambers | 21 MW | 6 | 1991 |
| Engineered Carbons Borger Cogen | Hutchinson | 20 MW | 1 | 1982 |
| Phelps Dodge Refining | El Paso | 20 MW | 5 | 1986 |
| Mont Belvieu Cogeneration Unit | Chambers | 15 MW | 1 | 2009 |
| Central Utility Plant | Travis | 14 MW | 3 | 1988 |
| HEBHoustonDistributionCenter | Harris | 13 MW | 32 | 2021 |
| Village Creek Water Reclamation Facility | Tarrant | 12 MW | 4 | 1994 |
| FTBLID2 | Fort Bend | 11 MW | 28 | 2021 |
| NASA Johnson Space Center CHP | Harris | 11 MW | 2 | 2018 |
| Bridgeport Gas Processing Plant | Wise | 10 MW | 13 | 2000 |
| Cedarvale Gas | Ward | 10 MW | 4 | 2026 |
| Pyote Gas | Ward | 10 MW | 4 | 2026 |
| OTHERTexasA&M | Brazos | 9.6 MW | 24 | 2018 |
| Rice University | Harris | 6.9 MW | 2 | 1986 |
| HEBTEMDistCenter | Bell | 6.4 MW | 16 | 2023 |
| HEBTEMDistCenter2A | Bell | 6.4 MW | 16 | 2024 |
| HEB_CPSSADC | Bexar | 6.4 MW | 16 | 2020 |
| OTHERChildrensPlano | Collin | 6.4 MW | 16 | 2025 |
| Robert Mueller Energy Center | Travis | 6.1 MW | 2 | 2006 |
| AbbVie Waco | McLennan | 5.6 MW | 14 | 2023 |
| The Methodist Hospital, Gas Turbine | Harris | 5.0 MW | 1 | 2010 |
| Tenet Hospital | El Paso | 4.2 MW | 2 | 1987 |
| Westhollow Technology Center | Harris | 3.7 MW | 1 | 1988 |
| HEBCCBakery | Nueces | 3.2 MW | 8 | 2019 |
| RavenChem | Harris | 3.2 MW | 8 | 2021 |
| OTHERCitizensHospital | Victoria | 2.8 MW | 7 | 2020 |
| OTHERNFBWA | Fort Bend | 2.4 MW | 6 | 2021 |
| Jameson Gas Processing Plant | Coke | 1.8 MW | 4 | 1981 |
| BUC00040 | Fort Bend | 1.6 MW | 4 | 2017 |
| HEB00063 | Brazoria | 1.6 MW | 4 | 2017 |
| HEB00069 | Nueces | 1.6 MW | 4 | 2017 |
| HEB00092 | Victoria | 1.6 MW | 4 | 2018 |
| HEB00095 | Webb | 1.6 MW | 4 | 2018 |
| HEB00591 | Williamson | 1.6 MW | 4 | 2018 |
| HEBSnackPlant | Harris | 1.6 MW | 4 | 2019 |
| HEB_CPS00085 | Bexar | 1.6 MW | 4 | 2019 |
| OTHERBenEKDallas | Dallas | 1.6 MW | 4 | 2023 |
| WAL3510 | Brazoria | 1.3 MW | 1 | 2019 |
| WAL3572 | Brazoria | 1.3 MW | 1 | 2019 |
| WAL462 | Brazoria | 1.3 MW | 1 | 2019 |
| WAL529 | Galveston | 1.3 MW | 1 | 2019 |
| WAL5388 | Galveston | 1.3 MW | 1 | 2020 |
| WAL897 | Pecos | 1.3 MW | 1 | 2021 |
| HEB00020 | Harris | 1.2 MW | 3 | 2018 |
| HEB00028 | Galveston | 1.2 MW | 3 | 2017 |
| HEB00038 | Hidalgo | 1.2 MW | 3 | 2018 |
| HEB00048 | Jefferson | 1.2 MW | 3 | 2021 |
| HEB00054 | Harris | 1.2 MW | 3 | 2018 |
| HEB00055 | Tarrant | 1.2 MW | 3 | 2023 |
| HEB00057 | Nueces | 1.2 MW | 3 | 2017 |
| HEB00070 | Taylor | 1.2 MW | 3 | 2018 |
| HEB00099 | Harris | 1.2 MW | 3 | 2017 |
| HEB00109 | Harris | 1.2 MW | 3 | 2018 |
| HEB00110 | Fort Bend | 1.2 MW | 3 | 2017 |
| HEB00182 | Bell | 1.2 MW | 3 | 2018 |
| HEB00292 | Matagorda | 1.2 MW | 3 | 2016 |
| HEB00594 | Montgomery | 1.2 MW | 3 | 2019 |
| HEB00750 | Tarrant | 1.2 MW | 3 | 2024 |
| HEB00760 | Brazoria | 1.2 MW | 3 | 2023 |
| HEB00767 | Montgomery | 1.2 MW | 3 | 2022 |
| HEB00769 | Harris | 1.2 MW | 3 | 2021 |
| HEB00776 | Harris | 1.2 MW | 3 | 2022 |
| HEB00779 | Harris | 1.2 MW | 3 | 2024 |
| HEB00789 | Denton | 1.2 MW | 3 | 2022 |
| HEB00790 | Collin | 1.2 MW | 3 | 2022 |
| HEB00794 | Collin | 1.2 MW | 3 | 2023 |
| HEB00796 | Collin | 1.2 MW | 3 | 2023 |
| HEB00797 | Harris | 1.2 MW | 3 | 2024 |
| HEB00798 | Harris | 1.2 MW | 3 | 2024 |
| HEB00801 | Tarrant | 1.2 MW | 3 | 2024 |
| HEB_CPS00793 | Bexar | 1.2 MW | 3 | 2025 |
| OTHERTraditionBuffalo | Harris | 1.2 MW | 3 | 2024 |
| OTHERTraditionClearfork | Tarrant | 1.2 MW | 3 | 2023 |
| Praxair | Brazoria | 1.2 MW | 3 | 2019 |
| WAL1040 | Harris | 1.2 MW | 3 | 2019 |
| WAL1062 | Harris | 1.2 MW | 3 | 2021 |
| WAL1103 | Harris | 1.2 MW | 3 | 2019 |
| WAL1232 | Bell | 1.2 MW | 3 | 2020 |
| WAL1272 | Scurry | 1.2 MW | 3 | 2021 |
| WAL1455 | Tarrant | 1.2 MW | 3 | 2021 |
| WAL1801 | Tarrant | 1.2 MW | 3 | 2022 |
| WAL194 | Harris | 1.2 MW | 3 | 2021 |
| WAL2257 | Harris | 1.2 MW | 3 | 2021 |
| WAL2439 | Chambers | 1.2 MW | 3 | 2021 |
| WAL266 | Tarrant | 1.2 MW | 3 | 2021 |
| WAL2667 | Dallas | 1.2 MW | 3 | 2021 |
| WAL2724 | Harris | 1.2 MW | 3 | 2020 |
| WAL284 | Tarrant | 1.2 MW | 3 | 2021 |
| WAL2883 | Collin | 1.2 MW | 3 | 2021 |
| WAL2980 | Tarrant | 1.2 MW | 3 | 2021 |
| WAL2993 | Fort Bend | 1.2 MW | 3 | 2021 |
| WAL3224 | Dallas | 1.2 MW | 3 | 2022 |
| WAL3226 | Fort Bend | 1.2 MW | 3 | 2019 |
| WAL3284 | Tarrant | 1.2 MW | 3 | 2021 |
| WAL3285 | Dallas | 1.2 MW | 3 | 2021 |
| WAL3297 | Harris | 1.2 MW | 3 | 2020 |
| WAL3298 | Galveston | 1.2 MW | 3 | 2020 |
| WAL3302 | Harris | 1.2 MW | 3 | 2021 |
| WAL3320 | Hidalgo | 1.2 MW | 3 | 2021 |
| WAL3390 | Montgomery | 1.2 MW | 3 | 2020 |
| WAL3406 | Dallas | 1.2 MW | 3 | 2022 |
| WAL3425 | Harris | 1.2 MW | 3 | 2021 |
| WAL3432 | Dallas | 1.2 MW | 3 | 2021 |
| WAL3500 | Harris | 1.2 MW | 3 | 2021 |
| WAL3518 | Webb | 1.2 MW | 3 | 2021 |
| WAL3584 | Harris | 1.2 MW | 3 | 2021 |
| WAL3631 | Tarrant | 1.2 MW | 3 | 2020 |
| WAL3773 | Tarrant | 1.2 MW | 3 | 2020 |
| WAL3827 | Fort Bend | 1.2 MW | 3 | 2020 |
| WAL3886 | Hidalgo | 1.2 MW | 3 | 2021 |
| WAL407 | Bell | 1.2 MW | 3 | 2021 |
| WAL414 | Wichita | 1.2 MW | 3 | 2021 |
| WAL4298 | Harris | 1.2 MW | 3 | 2021 |
| WAL447 | Val Verde | 1.2 MW | 3 | 2021 |
| WAL4509 | Tarrant | 1.2 MW | 3 | 2020 |
| WAL4512 | Harris | 1.2 MW | 3 | 2020 |
| WAL452 | Hidalgo | 1.2 MW | 3 | 2021 |
| WAL4526 | Harris | 1.2 MW | 3 | 2021 |
| WAL4538 | Harris | 1.2 MW | 3 | 2019 |
| WAL456 | Cameron | 1.2 MW | 3 | 2021 |
| WAL461 | Maverick | 1.2 MW | 3 | 2021 |
| WAL504 | Galveston | 1.2 MW | 3 | 2022 |
| WAL5045 | Harris | 1.2 MW | 3 | 2020 |
| WAL5080 | Tarrant | 1.2 MW | 3 | 2022 |
| WAL5091 | Harris | 1.2 MW | 3 | 2020 |
| WAL5116 | Harris | 1.2 MW | 3 | 2020 |
| WAL5165 | Hidalgo | 1.2 MW | 3 | 2021 |
| WAL522 | Harris | 1.2 MW | 3 | 2020 |
| WAL5287 | Harris | 1.2 MW | 3 | 2020 |
| WAL5312 | Tarrant | 1.2 MW | 3 | 2021 |
| WAL5316 | Tarrant | 1.2 MW | 3 | 2020 |
| WAL536 | Jones | 1.2 MW | 3 | 2021 |
| WAL537 | Ector | 1.2 MW | 3 | 2021 |
| WAL546 | Fort Bend | 1.2 MW | 3 | 2020 |
| WAL5479 | Travis | 1.2 MW | 3 | 2021 |
| WAL5480 | Williamson | 1.2 MW | 3 | 2021 |
| WAL5612 | Harris | 1.2 MW | 3 | 2021 |
| WAL565 | Navarro | 1.2 MW | 3 | 2022 |
| WAL5713 | Webb | 1.2 MW | 3 | 2021 |
| WAL5764 | Tarrant | 1.2 MW | 3 | 2021 |
| WAL602 | Montgomery | 1.2 MW | 3 | 2020 |
| WAL6929 | Bell | 1.2 MW | 3 | 2020 |
| WAL744 | Harris | 1.2 MW | 3 | 2020 |
| WAL752 | Harris | 1.2 MW | 3 | 2020 |
| WAL768 | Harris | 1.2 MW | 3 | 2019 |
| WAL772 | Harris | 1.2 MW | 3 | 2021 |
| WAL791 | Jim Wells | 1.2 MW | 3 | 2021 |
| WAL849 | Harris | 1.2 MW | 3 | 2020 |
| WAL872 | Brazoria | 1.2 MW | 3 | 2020 |
| WAL896 | Dallas | 1.2 MW | 3 | 2021 |
| WAL940 | Tarrant | 1.2 MW | 3 | 2020 |
| WAL947 | Grayson | 1.2 MW | 3 | 2020 |
| WAL972 | Tarrant | 1.2 MW | 3 | 2020 |
Wind230 plants · 44,867 MW
All US wind plants →Solar242 plants · 35,889 MW
All US solar plants →Coal12 plants · 17,853 MW
All US coal plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| W A Parish | Fort Bend | 4,008 MW | 9 | 1958 |
| Martin Lake | Rusk | 2,380 MW | 3 | 1977 |
| Limestone | Limestone | 1,850 MW | 2 | 1985 |
| Oak Grove (TX) | Robertson | 1,795 MW | 2 | 2010 |
| Fayette Power Project | Fayette | 1,690 MW | 3 | 1979 |
| J K Spruce | Bexar | 1,489 MW | 2 | 1992 |
| Tolk | Lamb | 1,136 MW | 2 | 1982 |
| Welsh | Titus | 1,116 MW | 2 | 1977 |
| Sandy Creek Energy Station | McLennan | 1,008 MW | 1 | 2013 |
| Coleto Creek | Goliad | 622 MW | 1 | 1980 |
| San Miguel | Atascosa | 410 MW | 1 | 1982 |
| Major Oak Power | Robertson | 349 MW | 2 | 1990 |
Battery storage226 plants · 15,517 MW
All US battery storage plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| SAHARA BESS (SOHO BESS) | Brazoria | 409 MW | 2 | 2026 |
| Platinum Storage | Fannin | 348 MW | 1 | 2026 |
| SMT Ironman Battery Storage Plant | Brazoria | 304 MW | 1 | 2025 |
| Cartwheel 1 - Storage, LLC | Hopkins | 300 MW | 1 | 2025 |
| GulfStar Power, LLC | Wharton | 300 MW | 1 | 2025 |
| PP Jaguar BESS LLC | McLennan | 300 MW | 2 | 2025 |
| Rodeo Ranch Energy Storage | Reeves | 300 MW | 1 | 2023 |
| Tanzanite Storage | Henderson | 283 MW | 1 | 2025 |
| Old 300 Storage Center | Fort Bend | 250 MW | 1 | 2026 |
| Anole Energy Storage | Dallas | 240 MW | 1 | 2025 |
| Libra Storage | Guadalupe | 236 MW | 1 | 2023 |
| Guajillo Energy Storage | Webb | 229 MW | 1 | 2025 |
| Callisto I Energy Center | Harris | 223 MW | 1 | 2024 |
| Hidden Lakes Reliability Project | Galveston | 220 MW | 1 | 2025 |
| Ebony Energy Storage | Comal | 208 MW | 1 | 2024 |
| Citadel Battery Storage Plant | Harris | 204 MW | 1 | 2024 |
| Crossett Power Management LLC | Crane | 203 MW | 1 | 2022 |
| Anemoi Energy Storage | Hidalgo | 200 MW | 1 | 2024 |
| Bypass BESS | Fort Bend | 200 MW | 1 | 2026 |
| Cachi | Guadalupe | 200 MW | 1 | 2025 |
| Desna | Brazoria | 200 MW | 1 | 2026 |
| Destiny Storage | Harris | 200 MW | 1 | 2026 |
| Dickens | Dickens | 200 MW | 1 | 2024 |
| Ferdinand Energy Center | Bexar | 200 MW | 1 | 2026 |
| Hydra | Pecos | 200 MW | 1 | 2024 |
| Paleo | Hale | 200 MW | 1 | 2024 |
| Sealy BESS | Austin | 200 MW | 1 | 2025 |
| Tidwell Prairie Storage 1 | Robertson | 200 MW | 1 | 2025 |
| Cunningham Storage | Hunt | 190 MW | 1 | 2023 |
| Pavo | Pecos | 175 MW | 1 | 2024 |
| Longbow BESS, LLC | Brazoria | 174 MW | 1 | 2024 |
| Longhorn Storage | Eastland | 165 MW | 1 | 2024 |
| Avila | Pecos | 160 MW | 1 | 2025 |
| Blue Summit II Storage | Wilbarger | 150 MW | 1 | 2026 |
| Bocanova Energy Storage | Brazoria | 150 MW | 1 | 2025 |
| Borden County BESS | Borden | 150 MW | 1 | 2024 |
| Carina | Nueces | 150 MW | 1 | 2025 |
| Chillingham Storage | Bell | 150 MW | 1 | 2025 |
| Cottonwood Bayou Storage | Brazoria | 150 MW | 1 | 2026 |
| Crowned Heron 1 - Storage, LLC | Fort Bend | 150 MW | 1 | 2026 |
| Danish Fields Storage | Wharton | 150 MW | 1 | 2026 |
| Desert Willow Energy Storage | Ellis | 150 MW | 1 | 2025 |
| Headcamp BESS | Pecos | 150 MW | 1 | 2026 |
| Myrtle Storage | Brazoria | 150 MW | 1 | 2026 |
| Padua 2 | Bexar | 150 MW | 1 | 2026 |
| Revolution | Crane | 150 MW | 1 | 2023 |
| Roadrunner Crossing Energy Storage | Eastland | 150 MW | 1 | 2025 |
| Wizard Energy Storage | Galveston | 150 MW | 1 | 2026 |
| Wolf Tank Storage | Webb | 150 MW | 1 | 2023 |
| Connolly BESS | Wise | 125 MW | 1 | 2024 |
| GFTX BESS | Travis | 125 MW | 1 | 2024 |
| Project Lynx | Nueces | 125 MW | 1 | 2026 |
| TE Smith Storage | Rockwall | 125 MW | 1 | 2026 |
| Sun Valley Storage | Hill | 123 MW | 1 | 2024 |
| Wigeon Whistle Battery Storage Plant | Collin | 120 MW | 1 | 2024 |
| Fort Duncan BESS | Maverick | 103 MW | 1 | 2025 |
| St. Gall Energy Storage I | Pecos | 103 MW | 1 | 2024 |
| Flower Valley II | Reeves | 101 MW | 1 | 2022 |
| Swoose II | Ward | 101 MW | 1 | 2022 |
| Al Pastor Battery Storage Plant | Dawson | 100 MW | 1 | 2024 |
| Ables Springs Solar & Storage | Kaufman | 100 MW | 1 | 2025 |
| Angelo Storage | Tom Green | 100 MW | 1 | 2025 |
| Bat Cave | Mason | 100 MW | 1 | 2021 |
| Bexar ESS | Bexar | 100 MW | 1 | 2026 |
| Brazos Bend BESS, LLC | Fort Bend | 100 MW | 1 | 2024 |
| Burksol Energy Storage | Dickens | 100 MW | 1 | 2025 |
| Chisholm Grid Energy Storage System | Tarrant | 100 MW | 1 | 2021 |
| Citrus Flatts Energy Center, LLC | Cameron | 100 MW | 1 | 2023 |
| Gambit Energy Storage - Angleton Storage | Brazoria | 100 MW | 1 | 2021 |
| Great Kiskadee Storage | Hidalgo | 100 MW | 1 | 2025 |
| Ignacio Grid Energy Storage System | Hidalgo | 100 MW | 1 | 2023 |
| Madero Grid | Hidalgo | 100 MW | 1 | 2023 |
| North Fork TX | Williamson | 100 MW | 1 | 2021 |
| Seven Flags BESS LLC | Webb | 100 MW | 1 | 2026 |
| St Gall Energy Storage II | Pecos | 100 MW | 1 | 2025 |
| TX10 Hummingbird Storage | Denton | 100 MW | 1 | 2024 |
| TX12 Silicon Hill Storage | Travis | 100 MW | 1 | 2022 |
| TX15 Limousin Oak Storage | Grimes | 100 MW | 1 | 2024 |
| Tierra Seca | Val Verde | 100 MW | 1 | 2026 |
| Carambola BESS | Hidalgo | 98 MW | 1 | 2026 |
| Dogfish BESS | Pecos | 75 MW | 1 | 2025 |
| House Mountain | Brewster | 73 MW | 1 | 2024 |
| Ranchland Wind Storage | Callahan | 73 MW | 1 | 2023 |
| Antlia | Val Verde | 70 MW | 1 | 2025 |
| Lower Rio Energy Storage | Hidalgo | 60 MW | 1 | 2025 |
| Cross Trails Energy Storage Project | Scurry | 58 MW | 1 | 2025 |
| Roseland Solar Project, LLC | Falls | 52 MW | 1 | 2023 |
| Blue Jay Solar I, LLC | Grimes | 52 MW | 1 | 2023 |
| Byrd Ranch Storage | Brazoria | 50 MW | 1 | 2022 |
| Padua 1 | Bexar | 50 MW | 1 | 2025 |
| TX11 Republic Road Storage | Robertson | 50 MW | 1 | 2022 |
| TX13 Endurance Park Storage | Scurry | 50 MW | 1 | 2022 |
| TX19 River Valley Storage 1 | Williamson | 50 MW | 1 | 2023 |
| TX21 River Valley Storage 2 | Williamson | 50 MW | 1 | 2023 |
| TX23 Roughneck Storage | Brazoria | 50 MW | 1 | 2022 |
| Tortolas | Brazoria | 50 MW | 1 | 2024 |
| Blue Summit Storage, LLC | Wilbarger | 30 MW | 1 | 2017 |
| Upton County BESS | Upton | 25 MW | 1 | 2023 |
| Pueblo BA | Maverick | 20 MW | 2 | 2022 |
| Zapata | Zapata | 20 MW | 2 | 2022 |
| Inertia Energy Storage | Haskell | 13 MW | 1 | 2025 |
| Crosby Clean Energy Center (BESS) | Harris | 12 MW | 1 | 2025 |
| Maverick Clean Energy Center (BESS) | Brazoria | 12 MW | 1 | 2025 |
| Spencer Clean Energy Center (BESS) | Harris | 12 MW | 1 | 2025 |
| Winmil Clean Energy Center (BESS) | Brazoria | 12 MW | 1 | 2025 |
| Toyah Power Station | Reeves | 10 MW | 1 | 2021 |
| Alamo Clean Energy Center (BESS) | Pecos | 10 MW | 1 | 2026 |
| Fort Stockton Clean Energy Center (BESS) | Pecos | 10 MW | 1 | 2026 |
| North Pecos Clean Energy Center (BESS) | Reeves | 10 MW | 1 | 2026 |
| Aggreko MSR Grid PC2 | Nueces | 10 MW | 1 | 2026 |
| Aggreko MSR Grid PC5 | Cameron | 10 MW | 1 | 2026 |
| Aggreko MSR Grid PC7 | Cameron | 10 MW | 1 | 2026 |
| BESS La Feria | Cameron | 10 MW | 1 | 2026 |
| BESS Stadium | Jim Wells | 10 MW | 1 | 2026 |
| BESS TX Panda - BSHOU004 | Harris | 10 MW | 1 | 2025 |
| BESS TX Top Gear - BSHOU002 | Harris | 10 MW | 1 | 2025 |
| Century BESS | Tarrant | 10 MW | 1 | 2024 |
| Commerce ESS | Bexar | 10 MW | 1 | 2019 |
| Crockett BESS | Harris | 10 MW | 1 | 2024 |
| I-Eye ESS | Wharton | 10 MW | 1 | 2025 |
| Liggett Switch | Tarrant | 10 MW | 1 | 2024 |
| Matta Power Station | Reeves | 10 MW | 1 | 2023 |
| SME Mission II BESS | Hidalgo | 10 MW | 1 | 2025 |
| SMT Alamo LLC | Hidalgo | 10 MW | 1 | 2023 |
| SMT Bay City LLC | Matagorda | 10 MW | 1 | 2023 |
| SMT Dallas BESS | Dallas | 10 MW | 1 | 2025 |
| SMT Dallas III BESS | Dallas | 10 MW | 1 | 2026 |
| SMT Elsa LLC | Hidalgo | 10 MW | 1 | 2023 |
| SMT Harlingen II LLC | Cameron | 10 MW | 1 | 2023 |
| SMT Los Fresnos LLC | Cameron | 10 MW | 1 | 2023 |
| SMT Mercedes LLC | Hidalgo | 10 MW | 1 | 2023 |
| SMT Mission LLC | Hidalgo | 10 MW | 1 | 2023 |
| SMT Rio Grande I LLC | Starr | 10 MW | 1 | 2023 |
| SMT Rio Grande II LLC | Starr | 10 MW | 1 | 2023 |
| SMT Santa Rosa LLC | Cameron | 10 MW | 1 | 2023 |
| Snyder BESS | Scurry | 10 MW | 1 | 2021 |
| Sweetwater BESS | Nolan | 10 MW | 1 | 2021 |
| Telview ESS | Harris | 10 MW | 1 | 2025 |
| Westover BESS | Ector | 10 MW | 1 | 2021 |
| Alvin | Brazoria | 9.9 MW | 1 | 2020 |
| Angleton | Brazoria | 9.9 MW | 1 | 2020 |
| Bexar Corrilla BESS | Bexar | 9.9 MW | 1 | 2026 |
| Brazoria | Brazoria | 9.9 MW | 1 | 2020 |
| Buda BESS | Hays | 9.9 MW | 1 | 2026 |
| CISCO BESS | Eastland | 9.9 MW | 1 | 2024 |
| Caterina | Dimmit | 9.9 MW | 1 | 2022 |
| Cedarville (TX) | Reeves | 9.9 MW | 1 | 2022 |
| Citrus City BESS | Hidalgo | 9.9 MW | 1 | 2025 |
| Cotulla BESS 1 | La Salle | 9.9 MW | 1 | 2026 |
| County Road BESS | Reeves | 9.9 MW | 1 | 2026 |
| Coyote Springs (TX) | Reeves | 9.9 MW | 1 | 2022 |
| DGS Five Points | Taylor | 9.9 MW | 1 | 2026 |
| Diboll BESS | Angelina | 9.9 MW | 1 | 2024 |
| Dickinson | Galveston | 9.9 MW | 1 | 2021 |
| Elm Street BESS | Reeves | 9.9 MW | 1 | 2026 |
| Falfurrias BESS | Brooks | 9.9 MW | 1 | 2024 |
| Farmersville (TX) | Collin | 9.9 MW | 1 | 2024 |
| Farmersville West | Collin | 9.9 MW | 1 | 2025 |
| Faulkner | Reeves | 9.9 MW | 1 | 2022 |
| Flower Valley I | Reeves | 9.9 MW | 1 | 2021 |
| Garden City East BESS | Glasscock | 9.9 MW | 1 | 2024 |
| Gomez | Pecos | 9.9 MW | 1 | 2023 |
| Hamilton BESS | Val Verde | 9.9 MW | 1 | 2024 |
| Heights | Galveston | 9.9 MW | 1 | 2020 |
| Highway 6 BESS | Brazos | 9.9 MW | 1 | 2026 |
| Holcomb (TX) | La Salle | 9.9 MW | 1 | 2023 |
| Judkins BESS | Ector | 9.9 MW | 1 | 2024 |
| Junction (TX) | Kimble | 9.9 MW | 1 | 2023 |
| Junction BESS | Kimble | 9.9 MW | 1 | 2025 |
| Lonestar | Ward | 9.9 MW | 1 | 2022 |
| Loop 463 | Victoria | 9.9 MW | 1 | 2021 |
| Lopeno | Zapata | 9.9 MW | 1 | 2022 |
| Lufkin South BESS | Angelina | 9.9 MW | 1 | 2024 |
| Magnolia TX | Galveston | 9.9 MW | 1 | 2020 |
| Mainland | Galveston | 9.9 MW | 1 | 2024 |
| Meadow Park Energy Center | Tarrant | 9.9 MW | 1 | 2026 |
| Mineral Wells East BESS | Palo Pinto | 9.9 MW | 1 | 2024 |
| Non-PLD US-El Paso - BSSAT004 | Ector | 9.9 MW | 1 | 2025 |
| Odessa | Ector | 9.9 MW | 1 | 2020 |
| Palmview BESS | Hidalgo | 9.9 MW | 1 | 2026 |
| Pauline BESS | Henderson | 9.9 MW | 1 | 2024 |
| Pavlov | Matagorda | 9.9 MW | 1 | 2024 |
| Plaza Street | Taylor | 9.9 MW | 1 | 2026 |
| Poteet | Atascosa | 9.9 MW | 1 | 2026 |
| Prospect Storage | Brazoria | 9.9 MW | 1 | 2020 |
| Rabbit Hill Energy Storage Project | Williamson | 9.9 MW | 1 | 2020 |
| Ranchtown | Bexar | 9.9 MW | 1 | 2021 |
| Rattlesnake (TX) | Ward | 9.9 MW | 1 | 2022 |
| Regis Carrizo Springs | Dimmit | 9.9 MW | 1 | 2025 |
| Regis Continental | Starr | 9.9 MW | 1 | 2024 |
| Regis Escondido | Maverick | 9.9 MW | 1 | 2026 |
| Regis Falfurrias | Brooks | 9.9 MW | 1 | 2024 |
| Regis Gears Harris | Harris | 9.9 MW | 1 | 2026 |
| Regis Goodwin LLC | Starr | 9.9 MW | 1 | 2025 |
| Regis Gregory | San Patricio | 9.9 MW | 1 | 2024 |
| Regis Hearn | Nueces | 9.9 MW | 1 | 2024 |
| Regis Hidden Valley | Harris | 9.9 MW | 1 | 2026 |
| Regis Laureles | Cameron | 9.9 MW | 1 | 2026 |
| Regis Lyssy | Karnes | 9.9 MW | 1 | 2026 |
| Regis Mason | Mason | 9.9 MW | 1 | 2024 |
| Regis Medina Lake | Bandera | 9.9 MW | 1 | 2026 |
| Regis Milton | Karnes | 9.9 MW | 1 | 2026 |
| Regis Monte Cristo LLC | Hidalgo | 9.9 MW | 1 | 2024 |
| Regis Muenster | Cooke | 9.9 MW | 1 | 2024 |
| Regis Palacios | Matagorda | 9.9 MW | 1 | 2024 |
| Regis Pirate | San Patricio | 9.9 MW | 1 | 2024 |
| Regis Utopia | Bandera | 9.9 MW | 1 | 2026 |
| Rio Grande City BESS 2 | Starr | 9.9 MW | 1 | 2025 |
| Russek | Reagan | 9.9 MW | 1 | 2025 |
| SE Edinburg BESS | Hidalgo | 9.9 MW | 1 | 2026 |
| Saddleback BESS2 | Reeves | 9.9 MW | 1 | 2022 |
| Sandlake | Reeves | 9.9 MW | 1 | 2024 |
| Screwbean | Culberson | 9.9 MW | 1 | 2023 |
| Sunset Ridge Energy Center, LLC | Frio | 9.9 MW | 1 | 2023 |
| Sweeny | Brazoria | 9.9 MW | 1 | 2021 |
| Swoose I | Ward | 9.9 MW | 1 | 2021 |
| TX2 Port Lavaca | Calhoun | 9.9 MW | 1 | 2020 |
| TX7 Flat Top | Reeves | 9.9 MW | 1 | 2020 |
| TX8 Worsham | Pecos | 9.9 MW | 1 | 2020 |
| Tynan | Bee | 9.9 MW | 1 | 2025 |
| Val Verde | Hidalgo | 9.9 MW | 1 | 2024 |
| Weil Tract BESS | Nueces | 9.9 MW | 1 | 2024 |
| Triple Butte I | Pecos | 7.5 MW | 1 | 2021 |
| System Control Center | Travis | 5.0 MW | 2 | 2012 |
| Johnson City BESS | Blanco | 2.3 MW | 1 | 2020 |
| Kingsberry Energy Storage System | Travis | 1.5 MW | 1 | 2018 |
Nuclear2 plants · 5,139 MW
All US nuclear plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| South Texas Project | Matagorda | 2,709 MW | 2 | 1988 |
| Comanche Peak | Somervell | 2,430 MW | 2 | 1990 |
Other48 plants · 1,448 MW
All US other plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Morgan Creek | Mitchell | 536 MW | 6 | 1988 |
| Nacogdoches Power | Nacogdoches | 114 MW | 1 | 2012 |
| Powerlane Plant | Hunt | 112 MW | 6 | 1966 |
| Valero Refinery Corpus Christi West | Nueces | 69 MW | 3 | 1983 |
| Air Products Texas City | Galveston | 65 MW | 1 | 2025 |
| International Paper Texarkana Mill | Cass | 65 MW | 2 | 1972 |
| WestRock (TX) | Jasper | 58 MW | 3 | 1954 |
| Woodville Renewable Power Project | Tyler | 50 MW | 1 | 2014 |
| USG Paper, LLC - Orange Mill | Orange | 48 MW | 1 | 1967 |
| BP Chemicals Green Lake Plant | Calhoun | 39 MW | 2 | 1989 |
| Texas City Plant Union Carbide | Galveston | 26 MW | 1 | 1996 |
| Olney | Young | 20 MW | 2 | 2023 |
| Rentech Nitrogen Pasadena Cogeneration | Harris | 15 MW | 1 | 2015 |
| State Farm Insur Support Center Central | Dallas | 11 MW | 6 | 1998 |
| Bakke | Andrews | 9.0 MW | 15 | 2013 |
| Citrus City | Hidalgo | 9.0 MW | 15 | 2013 |
| Clara | Harris | 9.0 MW | 15 | 2013 |
| Cutten | Harris | 9.0 MW | 15 | 2013 |
| E. Porte Ct. | Cameron | 9.0 MW | 15 | 2013 |
| Frankel | Andrews | 9.0 MW | 15 | 2013 |
| Goldsmith | Ector | 9.0 MW | 15 | 2013 |
| Mckeever | Fort Bend | 9.0 MW | 15 | 2013 |
| N. Mary Francis | Ector | 9.0 MW | 15 | 2013 |
| Ridge Rd | Hidalgo | 9.0 MW | 15 | 2013 |
| Santa Rosa | Cameron | 9.0 MW | 15 | 2013 |
| Southwick | Harris | 9.0 MW | 15 | 2013 |
| Stonegate | Fort Bend | 9.0 MW | 15 | 2013 |
| Tumbleweed | Andrews | 9.0 MW | 15 | 2013 |
| Vaquero | Cameron | 9.0 MW | 15 | 2013 |
| Villa Cavasos | Cameron | 9.0 MW | 15 | 2013 |
| Westover | Ector | 9.0 MW | 15 | 2013 |
| Seadrift Coke LP | Calhoun | 7.6 MW | 1 | 1983 |
| Houston Plant | Harris | 7.5 MW | 2 | 1970 |
| GCWA | Galveston | 7.2 MW | 12 | 2013 |
| Snider Industries | Harrison | 5.0 MW | 1 | 1983 |
| Works 4 | Wichita | 4.9 MW | 3 | 1974 |
| Austin Gas Recovery | Travis | 4.8 MW | 3 | 2007 |
| PRSI FCC Generator | Harris | 4.7 MW | 1 | 1979 |
| Nelson Gardens Landfill Gas to Energy | Bexar | 4.4 MW | 4 | 2014 |
| Ameresco Dallas LLC | Dallas | 4.2 MW | 3 | 2011 |
| Farmers Branch Renewable Energy Facility | Denton | 3.2 MW | 2 | 2011 |
| Mesquite Creek LFGTE Project | Comal | 3.2 MW | 2 | 2010 |
| Westside Landfill Gas Recovery | Parker | 3.2 MW | 2 | 2010 |
| CG PS Victoria WWTP, LLC | Victoria | 1.3 MW | 1 | 2020 |
| WAL202 | Collin | 1.3 MW | 1 | 2020 |
| WAL3777 | Denton | 1.3 MW | 1 | 2020 |
| WAL5211 | Collin | 1.3 MW | 1 | 2020 |
| WAL5311 | Collin | 1.3 MW | 1 | 2020 |
Hydro23 plants · 735 MW
All US hydro plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Marshall Ford | Travis | 108 MW | 3 | 1941 |
| Denison | Grayson | 104 MW | 2 | 1945 |
| Toledo Bend | Newton | 81 MW | 2 | 1969 |
| Amistad Dam & Power | Val Verde | 66 MW | 2 | 1983 |
| Buchanan Dam (TX) | Llano | 55 MW | 3 | 1938 |
| Granite Shoals | Burnet | 54 MW | 2 | 1951 |
| Sam Rayburn Dam | Jasper | 52 MW | 2 | 1965 |
| Whitney | Bosque | 42 MW | 2 | 1953 |
| Marble Falls | Burnet | 40 MW | 2 | 1951 |
| Falcon Dam & Power | Starr | 32 MW | 3 | 1954 |
| RC Thomas Hydroelectric Project | Polk | 27 MW | 3 | 2020 |
| Austin | Travis | 18 MW | 2 | 1940 |
| Inks | Burnet | 15 MW | 1 | 1938 |
| Eagle Pass | Maverick | 9.6 MW | 3 | 1932 |
| Robert D Willis | Jasper | 8.0 MW | 2 | 1989 |
| Canyon | Comal | 6.0 MW | 2 | 1989 |
| Dunlap TP 1 | Guadalupe | 3.6 MW | 2 | 1927 |
| Abbott TP 3 | Guadalupe | 2.8 MW | 2 | 1927 |
| Lewisville | Denton | 2.8 MW | 1 | 1992 |
| H 4 | Gonzales | 2.4 MW | 1 | 1931 |
| H 5 | Gonzales | 2.4 MW | 1 | 1931 |
| Nolte | Guadalupe | 2.4 MW | 2 | 1927 |
| TP 4 | Guadalupe | 2.4 MW | 1 | 1932 |
Sorted by nameplate capacity within each fuel. “Online” is the year the plant’s earliest surviving unit entered service.