Home / Power plants / California / Dynegy Moss Landing Power Plant Hybrid

Dynegy Moss Landing Power Plant Hybrid

Battery storage power plant · Monterey County, California

Nameplate capacity
1,848 MW
Rank in California
#2
of 1,897 plants
In service since
2002
July 2002

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Dynegy -Moss Landing LLC
County
Monterey County
Generating units
8
Share of state capacity
1.71%
Rank among battery storage plants in California
#1 of 142
EIA plant code
260

Generating units

Individual generating units at Dynegy Moss Landing Power Plant Hybrid
UnitTechnologyNameplateSummerOnlineStatus
BAT3Batteries350 MW350 MW2023Operating
CT1ANatural Gas Fired Combined Cycle233 MW165 MW2002Operating
CT1BNatural Gas Fired Combined Cycle233 MW165 MW2002Operating
CT2ANatural Gas Fired Combined Cycle233 MW165 MW2002Operating
CT2BNatural Gas Fired Combined Cycle233 MW165 MW2002Operating
ST1Natural Gas Fired Combined Cycle233 MW180 MW2002Operating
ST2Natural Gas Fired Combined Cycle233 MW180 MW2002Operating
BAT2Batteries100 MW100 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Diablo CanyonNuclear2,323 MW
HaynesNatural gas1,739 MW
CastaicHydro1,682 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1,848 MW solar plant and a 1,848 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates