Home / Power plants / California / Chaparral Springs

Chaparral Springs

Solar power plant · Kern County, California

Nameplate capacity
262 MW
Rank in California
#92
of 1,897 plants
In service since
2025
April 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Leeward Asset Management, LLC
County
Kern County
Generating units
4
Share of state capacity
0.24%
Rank among solar plants in California
#30 of 937
EIA plant code
64864

Generating units

Individual generating units at Chaparral Springs
UnitTechnologyNameplateSummerOnlineStatus
CHAPSSolar Photovoltaic102 MW102 MW2025Operating
GEN01Solar Photovoltaic72 MW72 MW2025Operating
CHAPBBatteries52 MW52 MW2025Operating
WS3BABatteries36 MW36 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

GlenarmNatural gas266 MW
Ocotillo Express LLCWind265 MW
Edwards Sanborn E2Solar258 MW
Rosamond South 1Solar257 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 262 MW solar plant and a 262 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates