Home / Power plants / California / Genentech Vacaville Meter #1

Genentech Vacaville Meter #1

Solar power plant · Solano County, California

Nameplate capacity
6.1 MW
Rank in California
#942
of 1,897 plants
In service since
2017
May 2017

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Tesla Inc.
County
Solano County
Generating units
2
Share of state capacity
0.01%
Rank among solar plants in California
#311 of 937
EIA plant code
60844

Generating units

Individual generating units at Genentech Vacaville Meter #1
UnitTechnologyNameplateSummerOnlineStatus
PV1Solar Photovoltaic3.8 MW3.8 MW2017Operating
PV2Solar Photovoltaic2.3 MW2.3 MW2017Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Black ButteHydro6.1 MW
Gas Utilization FacilityOther6.1 MW
Oxbow (CA)Hydro6.1 MW
Altamont Gas RecoveryOther6.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 6.1 MW solar plant and a 6.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates