GreenStruxure BBU004, LLC
Solar power plant · Los Angeles County, California
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- ClearGen LLC
- County
- Los Angeles County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #633 of 937
- EIA plant code
- 69190
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SOLAR | Solar Photovoltaic | 1.6 MW | 1.6 MW | 2023 | Operating |
| BATT | Batteries | 0.2 MW | 0.2 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Foundation SaIinas Valley State Prison | Wind | 1.8 MW |
| Fresno Sunnyside High School Hybrid | Solar | 1.8 MW |
| Kaweah 2 | Hydro | 1.8 MW |
| MM Tulare Energy | Other | 1.8 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.8 MW solar plant and a 1.8 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates