Home / Power plants / California / McCoy Solar Energy Project Hybrid

McCoy Solar Energy Project Hybrid

Battery storage power plant · Riverside County, California

Nameplate capacity
501 MW
Rank in California
#41
of 1,897 plants
In service since
2015
August 2015

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
McCoy Solar, LLC
County
Riverside County
Generating units
9
Share of state capacity
0.46%
Rank among battery storage plants in California
#3 of 142
EIA plant code
58462

Generating units

Individual generating units at McCoy Solar Energy Project Hybrid
UnitTechnologyNameplateSummerOnlineStatus
MCST1Batteries230 MW230 MW2021Operating
1Solar Photovoltaic42 MW42 MW2016Operating
BLK7Solar Photovoltaic42 MW42 MW2016Operating
BLK3Solar Photovoltaic40 MW40 MW2016Operating
BLK8Solar Photovoltaic37 MW37 MW2015Operating
BLK4Solar Photovoltaic31 MW31 MW2015Operating
BLK5Solar Photovoltaic31 MW31 MW2015Operating
BLK6Solar Photovoltaic27 MW27 MW2015Operating
BLK2Solar Photovoltaic21 MW21 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Rexford Solar FarmSolar540 MW
El Segundo Energy Center LLCNatural gas537 MW
Walnut Creek Energy ParkNatural gas500 MW
Solar BlueSolar475 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 501 MW solar plant and a 501 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates