CA Flats Solar 150, LLC
Solar power plant · San Luis Obispo County, California
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Arevon Energy, Inc.
- County
- San Luis Obispo County
- Generating units
- 1
- Share of state capacity
- 0.14%
- Rank among solar plants in California
- #66 of 937
- EIA plant code
- 60034
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | 150 MW | 150 MW | 2019 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Alta Wind Energy Center III | Wind | 150 MW |
| Alta Wind VIII | Wind | 150 MW |
| Hudson - High Desert Hybrid | Solar | 150 MW |
| Maverick Solar 6, LLC | Solar | 150 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates