Home / Power plants / California / Fremont - Kato Rd

Fremont - Kato Rd

Solar power plant · Alameda County, California

Nameplate capacity
1.4 MW
Rank in California
#1614
of 1,897 plants
In service since
2016
December 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Tesla Inc.
County
Alameda County
Generating units
2
Share of state capacity
0.00%
Rank among solar plants in California
#747 of 937
EIA plant code
65131

Generating units

Individual generating units at Fremont - Kato Rd
UnitTechnologyNameplateSummerOnlineStatus
PV2Solar Photovoltaic0.9 MW0.9 MW2017Operating
PV1Solar Photovoltaic0.5 MW0.5 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.4 MW solar plant and a 1.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates