Daggett 3
Solar power plant · San Bernardino County, California
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Daggett Solar Power 3 LLC
- County
- San Bernardino County
- Generating units
- 2
- Share of state capacity
- 0.42%
- Rank among solar plants in California
- #8 of 937
- EIA plant code
- 64852
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| DAGGP | Solar Photovoltaic | 300 MW | 300 MW | 2023 | Operating |
| DAGGB | Batteries | 149 MW | 149 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Eland Solar & Storage Center, Phase 2 Hy | Solar | 458 MW |
| Desert Quartzite | Solar | 450 MW |
| Slate Hybrid | Solar | 440 MW |
| Panoche Energy Center | Natural gas | 432 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 449 MW solar plant and a 449 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates