Home / Power plants / California / Van der Hoek Solar Array/ Dairy

Van der Hoek Solar Array/ Dairy

Solar power plant · Fresno County, California

Nameplate capacity
2.4 MW
Rank in California
#1337
of 1,897 plants
In service since
2017
August 2017

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Maas Energy Works
County
Fresno County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#548 of 937
EIA plant code
64687

Generating units

Individual generating units at Van der Hoek Solar Array/ Dairy
UnitTechnologyNameplateSummerOnlineStatus
VDHSolar Photovoltaic2.4 MW3.0 MW2017Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Kern Sunset 1886-WDSolar2.4 MW
POM Plant 1Solar2.4 MW
Ameresco Butte CountyOther2.3 MW
Bio-RadSolar2.3 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.4 MW solar plant and a 2.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates