Home / Power plants / California / Cabazon Wind Partners

Cabazon Wind Partners

Wind power plant · Riverside County, California

Nameplate capacity
41 MW
Rank in California
#500
of 1,897 plants
In service since
2002
October 2002

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Shell Wind Energy Inc.
County
Riverside County
Generating units
1
Share of state capacity
0.04%
Rank among wind plants in California
#54 of 111
EIA plant code
56011

Generating units

Individual generating units at Cabazon Wind Partners
UnitTechnologyNameplateSummerOnlineStatus
V-47Onshore Wind Turbine41 MW41 MW2002Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Salt SpringsHydro42 MW
ForbestownHydro42 MW
Kern River 3Hydro40 MW
Butt ValleyHydro40 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 41 MW solar plant and a 41 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates