Home / Power plants / California / Morongo CRS 1

Morongo CRS 1

Solar power plant · Riverside County, California

Nameplate capacity
3.0 MW
Rank in California
#1220
of 1,897 plants
In service since
2024
November 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
County
Riverside County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#463 of 937
EIA plant code
69856

Generating units

Individual generating units at Morongo CRS 1
UnitTechnologyNameplateSummerOnlineStatus
MCRS1Solar Photovoltaic3.0 MW3.0 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Mill Creek 3Hydro3.0 MW
Mira LomaSolar3.0 MW
NLP GrangerSolar3.0 MW
New Hogan Power PlantHydro3.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.0 MW solar plant and a 3.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates