Danell Bros Inc
Solar power plant · Kings County, California
Nameplate capacity
2.6 MW
Rank in California
#1294
of 1,897 plants
In service since
2021
September 2021
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Renewable Solar, Inc
- County
- Kings County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #516 of 937
- EIA plant code
- 65364
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 12585 | Solar Photovoltaic | 2.6 MW | 2.6 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| CA - Amazon - SMF6 | Solar | 2.6 MW |
| CA - Ventura Co CCD - Moorpark College | Solar | 2.6 MW |
| ESCA-LL-COLTON, LLC | Solar | 2.6 MW |
| Grossmont College | Solar | 2.6 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.6 MW solar plant and a 2.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates