Home / Power plants / California / Bishop Ranch - BR 1-Y

Bishop Ranch - BR 1-Y

Solar power plant · Contra Costa County, California

Nameplate capacity
1.8 MW
Rank in California
#1452
of 1,897 plants
In service since
2022
March 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Distributed Solar Development, LLC
County
Contra Costa County
Generating units
4
Share of state capacity
0.00%
Rank among solar plants in California
#626 of 937
EIA plant code
66799

Generating units

Individual generating units at Bishop Ranch - BR 1-Y
UnitTechnologyNameplateSummerOnlineStatus
4087Solar Photovoltaic0.7 MW0.7 MW2022Operating
4087BBatteries0.7 MW0.7 MW2022Operating
4087GSolar Photovoltaic0.2 MW0.2 MW2022Operating
4087RSolar Photovoltaic0.2 MW0.2 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.8 MW solar plant and a 1.8 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates