Fresno Bullard High School Hybrid
Solar power plant · Fresno County, California
Nameplate capacity
1.6 MW
Rank in California
#1496
of 1,897 plants
In service since
2020
March 2020
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Forefront Power, LLC
- County
- Fresno County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #658 of 937
- EIA plant code
- 63420
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 903 | Solar Photovoltaic | 1.2 MW | 1.2 MW | 2020 | Operating |
| BA903 | Batteries | 0.4 MW | 0.4 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| EMWD - Sun City RWRF | Solar | 1.6 MW |
| Firestone Walker Brewery - Phase 1 | Solar | 1.6 MW |
| G2 Energy Hay Rd | Other | 1.6 MW |
| Gilead Foster City Solar Project | Solar | 1.6 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.6 MW solar plant and a 1.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates