Home / Power plants / California / El Centro Hybrid

El Centro Hybrid

Natural gas power plant · Imperial County, California

Nameplate capacity
388 MW
Rank in California
#55
of 1,897 plants
In service since
1952
August 1952

Details

Primary fuel
Natural gas
Technology
Natural Gas Fired Combined Cycle
Operator
Imperial Irrigation District
County
Imperial County
Generating units
7
Share of state capacity
0.36%
Rank among natural gas plants in California
#34 of 309
EIA plant code
389

Generating units

Individual generating units at El Centro Hybrid
UnitTechnologyNameplateSummerOnlineStatus
2ANatural Gas Fired Combined Cycle90 MW73 MW1993Operating
4Natural Gas Steam Turbine82 MW68 MW1968Operating
30Natural Gas Fired Combined Cycle66 MW42 MW2012Operating
31Natural Gas Fired Combined Cycle43 MW39 MW2012Operating
32Natural Gas Fired Combined Cycle43 MW39 MW2012Operating
2Natural Gas Fired Combined Cycle35 MW33 MW1952Operating
BESSBatteries30 MW30 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Arica SolarSolar399 MW
Pio Pico Energy CenterNatural gas395 MW
Magnolia Power ProjectNatural gas388 MW
Oberon II Solar ProjectSolar375 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 388 MW solar plant and a 388 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates