San Diego Sockers
Solar power plant · San Diego County, California
Nameplate capacity
1.1 MW
Rank in California
#1730
of 1,897 plants
In service since
2025
October 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- —
- County
- San Diego County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #824 of 937
- EIA plant code
- 69712
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 16C | Solar Photovoltaic | 0.6 MW | 0.6 MW | 2025 | Operating |
| 162B | Batteries | 0.5 MW | 0.5 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Rancho Cordova Medical Offices | Solar | 1.1 MW |
| Redlands Community Hospital | Natural gas | 1.1 MW |
| Santa Maria LFG Power Plant | Other | 1.1 MW |
| SeaWorld Aquatica | Solar | 1.1 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.1 MW solar plant and a 1.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates