Home / Power plants / California / Oberon II Solar Project

Oberon II Solar Project

Solar power plant · Riverside County, California

Nameplate capacity
375 MW
Rank in California
#57
of 1,897 plants
In service since
2023
September 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
County
Riverside County
Generating units
2
Share of state capacity
0.35%
Rank among solar plants in California
#11 of 937
EIA plant code
65735

Generating units

Individual generating units at Oberon II Solar Project
UnitTechnologyNameplateSummerOnlineStatus
OBIIPSolar Photovoltaic250 MW250 MW2023Operating
OBIIBBatteries125 MW125 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

El Centro HybridNatural gas388 MW
Magnolia Power ProjectNatural gas388 MW
Oberon Solar ProjectSolar375 MW
Arlington Energy Center IISolar365 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 375 MW solar plant and a 375 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates