Home / Power plants / California / CED West Side Canal Battery Storage

CED West Side Canal Battery Storage

Battery storage power plant · Imperial County, California

Nameplate capacity
131 MW
Rank in California
#219
of 1,928 plants
In service since
2023
June 2023

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
San Diego Gas & Electric Co
County
Imperial County
Generating units
1
Share of state capacity
0.12%
Rank among battery storage plants in California
#19 of 142
EIA plant code
65980

Generating units

Individual generating units at CED West Side Canal Battery Storage
UnitTechnologyNameplateSummerOnlineStatus
WCBSBatteries131 MW131 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 131 MW solar plant and a 131 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates