Home / Power plants / California / Five Points Pipeline

Five Points Pipeline

Solar power plant · Fresno County, California

Nameplate capacity
4.1 MW
Rank in California
#1089
of 1,897 plants
In service since
2025
December 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Maas Energy Works
County
Fresno County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#385 of 937
EIA plant code
69900

Generating units

Individual generating units at Five Points Pipeline
UnitTechnologyNameplateSummerOnlineStatus
26818Solar Photovoltaic4.1 MW4.1 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Slate CreekHydro4.2 MW
Canal Energy S23, LLCSolar4.1 MW
Lakeside PipelineSolar4.1 MW
Merced PipelineSolar4.1 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.1 MW solar plant and a 4.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates