Electrolyte BESS
Battery storage power plant · Kings County, California
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- Henrietta BESS LLC
- County
- Kings County
- Generating units
- 1
- Share of state capacity
- 0.09%
- Rank among battery storage plants in California
- #37 of 142
- EIA plant code
- 66661
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| HEN | Batteries | 99 MW | 99 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Caballero | Battery storage | 100 MW |
| SC 1 Data Center, Phase 2 | Other | 100 MW |
| Lead BESS 1 | Battery storage | 99 MW |
| Rising Tree Wind Farm III | Wind | 99 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 99 MW solar plant and a 99 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates